WPA Project numbers 46-b: Land Benefited Erosion Control; 46-c: Bank Protection Erosion Control; and 318: Miscellaneous Erosion Control (Sand Fixation), at Camp NC SP-1, Fort Macon State Park, 1934-1935
Select what you would like to download. If choosing to download an image, please select the file format you wish to download.
Please note full document download may take several minutes (PDF only).
Certain download types may have been restricted by the site administrator.
Select the document elements you would like to include in the embed code.