- Title
- Design noise report addendum : I-95 from I-74 (Exit 13) to south of US 301 (Fayetteville Road) (Exit 22), Robeson County, Federal Aid project 0095077, STIP Project I-6064A, B & C / I-5879, WBS #49067.3.1 and 49067.3.3
-
-
- Date
- July 2024
-
-
- Place
- ["North Carolina, United States","Robeson County, North Carolina, United States"]
-
Design noise report addendum : I-95 from I-74 (Exit 13) to south of US 301 (Fayetteville Road) (Exit 22), Robeson County, Federal Aid project 0095077, STIP Project I-6064A, B & C / I-5879, WBS #49067.3.1 and 49067.3.3
Hits:
(0)
























Design Noise Report Addendum
1-95 From 1-74 (Exit 13) to South of US 301 (Fayetteville
Road) (Exit 22)
Robeson County
Federal Aid Project 0095077
STIP Project I-6064A,
В
& C
/
1-5879
WBS #49067.3.1 and 49067.3.3
Prepared for:
The North Carolina Department of Transportation
Environmental Analysis Unit
Traffic Noise and Air Quality Group
July 2024
Date of Public Knowledge: December 29, 2020
In Compliance with NCDOT Traffic Noise Policy (October 6, 2016)
Submitted by:
^ARCADIS
FLATIRON
-iriNFRASTRUCTURE
JCCONSUUING 4 [NOWIBVC
^ UNITED
Wade I, 5420 Wade Park Boulevard, Suite 350
Raleigh, North Carolina, 27607
This DNR Addendum
supersedes the DNR
previously accepted
on June 27, 2023.
Select what you would like to download. If choosing to download an image, please select the file format you wish to download.
The Original File option allows download of the source file (including any features or enhancements included in the original file) and may take several minutes.
Certain download types may have been restricted by the site administrator.