Annual report for ... UT to Irish Buffalo Creek mitigation site, Cabarrus County, TIP no. R-2533B (Site 12) |
Previous | 1 of 2 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
|
This page
All
|
ANNUAL REPORT FOR 2011 UT to Irish Buffalo Creek Mitigation Site Cabarrus County TIP No. R-2533B (Site 12) Prepared By: Natural Environment Unit & Roadside Environmental Unit North Carolina Department of Transportation September 2011 TABLE OF CONTENTS SUMMARY ........................................................................................................... 1 1.0 INTRODUCTION: ....................................................................................... 2 .1 Project Description .......................................................................... 2 .2 Purpose .......................................................................................... 2 .3 Project History ................................................................................. 2 .4 Debit Ledger .................................................................................... 2 2.0 STREAM ASSESSMENT: ......................................................................... 5 .1 Success Criteria ............................................................................. 5 .2 Stream Description .......................................................................... 5 .2.1 Post Construction Conditions .......................................................... 5 .2.2 Monitoring Conditions ..................................................................... 5 .3 Results of Stream Monitoring ......................................................... 6 .3.1 Site Data ......................................................................................... 6 3.0 VEGETATION ............................................................................................ 7 .1 Description of Species ..................................................................... 7 .2 Results of Vegetation Monitoring ..................................................... 7 .3 Conclusions .................................................................................... 7 4.0 OVERALL CONCLUSIONS/RECOMMENDATIONS ................................. 7 5.0 REFERENCES: ......................................................................................... 8 FIGURES Figure 1 – Site Location Map ............................................................................... 3 Figure 2 – Site #12 Map ....................................................................................... 4 TABLES Table 1 – Site #12 Morphological Summary ........................................................ 6 APPENDICES Appendix A – Cross Sections Appendix B – Site Photographs 1 SUMMARY The following report summarizes the stream monitoring activities that have occurred during the Year 2011 at the UT to Irish Buffalo Creek Stream Mitigation Site (permitted Site #12) in Cabarrus County. The North Carolina Department of Transportation (NCDOT) completed construction in March 2005. This report provides the monitoring results for the fourth formal year of monitoring (Year 2011). The Year 2011 monitoring period is the fourth of five scheduled years of monitoring on the UT to Irish Buffalo Creek Mitigation Site (See Success Criteria Section 2.1). Based on the overall conclusions of monitoring at permitted Site #12 for UT to Irish Buffalo Creek, it has met the required monitoring protocols for the fourth formal year of monitoring. The channel throughout the relocated stream is stable at this time. The streambank and buffer areas have planted vegetation surviving for the fourth year of monitoring. NCDOT proposes to discontinue stream monitoring at the UT to Irish Buffalo Creek Mitigation Site. 2 1.0 INTRODUCTION 1.1 Project Description The following report summarizes the stream monitoring activities that have occurred during the Year 2011 at the UT to Irish Buffalo Creek Stream Mitigation Site. Site # 12 is located on NC 49 in Cabarrus County at Sta. 11+040 to Sta. 11+230 –L1- RT. (Figure 1). The UT to Irish Buffalo Creek Site was constructed to provide mitigation for stream impacts associated with Transportation Improvement Program (TIP) number R-2533B in Cabarrus County. The mitigation site provided approximately 563 linear feet of stream restoration. Construction was completed during March 2005 by the NCDOT. Stream restoration involved the installation of cross vanes, coir fiber matting and live stakes along the streambank, and bareroot seedlings in the buffer area. 1.2 Purpose In order for a mitigation site to be considered successful, the site must meet the success criteria. This report details the monitoring in 2011 at the UT to Irish Buffalo Creek Mitigation Site. Hydrologic monitoring was not required for this site. 1.3 Project History March 2005 Construction Completed March 2008 Replanted Site September 2008 Stream Channel Monitoring (1 year) October 2009 Stream Channel Monitoring (2 year) October 2010 Stream Channel Monitoring (3 year) September 2011 Stream Channel Monitoring (4 year) 1.4 Debit Ledger The entire UT to Irish Buffalo Creek (Site #12) stream mitigation site was used for the R-2533B project to compensate for unavoidable stream impacts. 3 Figure 1. Site Location Map 4 Figure 2. Site #12 Map 5 2.0 STREAM ASSESSMENT 2.1 Success Criteria The following surveys were conducted in support of the monitoring assessment and in accordance with the regulatory permits obtained for this project: Stream Geomorphological Assessment ¨ The stream shall be monitored for a duration of five years from the end of construction (channel modifications and vegetation planted) ¨ The data shall be collected and submitted to the US Army Corps of Engineers and N.C. Division of Water Quality no later than January 1st each year for five years after construction ¨ At Site #12, 563 linear feet of stream channel will be relocated. A permanent cross section shall be established in a meander and at an inflection point along the channel. ¨ In order to evaluate the stability of the new channel, the channel cross section at each permanent station identified above shall be measured on a yearly basis for five years and width:depth ratio compared to the as-built cross section 2.2 Stream Description 2.2.1 Post-Construction Conditions The restoration of UT to Irish Buffalo Creek Site #12 involved installation of cross vanes, coir fiber matting and live stakes along the streambank, and bareroot seedlings in the buffer area. 2.2.2 Monitoring Conditions The objective of the UT to Irish Buffalo Creek Site #12 stream restoration was to build an E4b stream as identified in Rosgen’s Applied River Morphology. A total of two cross sections (one in a riffle and one in a pool) were surveyed. For this report, only cross sections containing riffles were used in the comparison of channel morphology presented below in Table 1 (Site #12). 6 Table 1. Abbreviated Morphological Summary (UT Irish Buffalo Site #12) Variable Proposed 2008 2009 2010 2011 Riffle Cross- Section #1 Riffle Cross- Section #1 Riffle Cross- Section #1 Riffle Cross- Section #1 Drainage Area (mi2) 0.1 0.1 0.1 0.1 0.1 Bankfull Width (ft) 5.4 5.6 6 6 5.58 Bankfull Mean Depth (ft) 1.2 0.5 0.5 0.5 0.4 Width/Depth Ratio 4.5 11.1 12 12 13.95 Bankfull Cross Sectional Area (ft2) 5.0 2.8 3 3 2.21 Maximum Bankfull Depth (ft) 1.5 1.09 1.1 1.1 1.1 Width of Floodprone Area (ft) 18.0 17.1 17.1 17.1 16.87 Entrenchment Ratio 3.3 3.1 2.9 2.9 3.03 * Riffle values are used for classification purposes, pool values are shown in Appendix A. 2.3 Results of the Stream Assessment 2.3.1 Site Data The assessment included the survey of two cross sections at Site #12. Longitudinal profile monitoring was not required per the permit conditions and therefore was not completed. All of the cross sections were established during the 2008 monitoring year. Cross section locations were determined based on choosing segments that were representative of the entire reach. The cross sections are shown in Appendix A. Site #12 Cross-Sections: ¨ Cross-Section #1: UT Irish Buffalo Creek Site #12, midpoint of riffle ¨ Cross-Section #2: UT Irish Buffalo Creek Site #12, midpoint of pool Based on comparisons of all four years of monitoring data, all of the cross sections appear stable with little or no active bank erosion. Graphs of the cross sections are presented in Appendix A. Future survey data will vary depending on actual location of rod placement and alignment; however, this information should remain similar in appearance. Pebble counts were not required per the permit conditions and therefore were not completed. 7 3.0 VEGETATION: UT to IRISH BUFFALO CREEK 3.1 Description of Species The following tree species were planted on the stream bank: Salix nigra, Black Willow Cornus amomum, Silky Dogwood Alnus serrulata, Tag Alder The following tree species were planted in the buffer area: Liriodendron tulipifera, Yellow Poplar Platanus occidentalis, Sycamore Quercus nigra, Water Oak Faxinus pennsylvanica, Green Ash 3.2 Results of Vegetation Monitoring Streambank & Buffer Vegetation: The stream was vegetated throughout with black willow, silky dogwood, tulip poplar, sycamore, green ash, water oak, winged elm, cottonwood, and various herbaceous species. In accordance with the permit conditions, only visual monitoring of the stream and buffer vegetation is required, therefore no vegetation plots were set at this site. 3.3 Conclusions There were no vegetation monitoring plots established throughout the buffer planting area. After the fourth year of monitoring, the UT Irish Buffalo Creek Mitigation Site shows by visual observation that the tree species planted in the streambank and buffer areas are surviving. NCDOT proposes to discontinue visual vegetation monitoring of this site. 4.0 OVERALL CONCLUSIONS/RECOMMENDATIONS The UT to Irish Buffalo Creek Mitigation Site has met the required monitoring protocols for the fourth formal year of monitoring. The channel throughout the relocated stream is stable at this time. The streambank and buffer have vegetation surviving for the fourth formal year of monitoring. NCDOT proposes to discontinue monitoring the UT to Irish Buffalo Creek Mitigation Site. 8 5.0 REFERENCES North Carolina Department of Transportation (NCDOT), November 19, 2001. Permit for R-2533A and R-2533B (Action ID.199702364). North Carolina Department of Transportation (NCDOT), November 26, 2001. Permit for R-2533A and R-2533B (DWQ Project No. 011274). Rosgen, D.L, 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, Colorado. US Army Corps of Engineers (USACE), 2003. Stream Mitigation Guidelines. Prepared with cooperation from the US Environmental Protection Agency, NC Wildlife Resources Commission, and the NC Division of Water Quality. APPENDIX A CROSS SECTIONS Site #12: Cross-Section #1 (Riffle) Abbreviated Morphological Summary 2008 2009 2010 2011 Bankfull Cross Sectional Area (ft2) 2.8 3 3.17 2.21 Maximum Bankfull Depth (ft) 1.1 1.1 1.19 1.1 Width of the Floodprone Area (ft) 17.1 17.1 17.54 16.87 Bankfull Mean Depth (ft) 0.5 0.5 0.55 0.4 Width/Depth Ratio 11.1 12 10.4 13.95 Entrenchment Ratio 3.1 2.9 3.07 3.03 Bankfull Width (ft) 5.6 6 5.72 5.58 Site #12: Cross-Section #2 (Pool) Abbreviated Morphological Summary* 2008 2009 2010 2011 Bankfull Cross Sectional Area (ft2) 2.8 3.9 3.69 3.12 Maximum Bankfull Depth (ft) 1.3 1.3 1.2 1.09 Bankfull Mean Depth (ft) 0.7 0.8 0.67 0.59 Bankfull Width (ft) 4.9 4.9 5.54 5.27 * According to the Rosgen Classification of Natural Rivers floodprone width, entrenchement ratio, and width depth ratio are not measured in pool, glide, or run features. APPENDIX B SITE PHOTOGRAPHS Cross Section #3 at Station 4+95.6 Cross Section #7 at Station 17+75.6 UT Irish Buffalo Creek Site #12 Photo Point #1 (Upstream) Photo Point #1 (Downstream) Photo Point #2 (Upstream) Photo Point #2 (Downstream) Overview Photo (Upstream) Overview Photo (Downstream) September 2011
Object Description
Description
Title | Annual report for... UT to Irish Buffalo Creek mitigation site, Cabarrus County, TIP no. R-2533B (Site 12) |
Other Title | UT to Irish Buffalo Creek mitigation site, Cabarrus County |
Date | 2011-09 |
Description | 2011 |
Digital Characteristics-A | 1.01 MB; 15 p. |
Digital Format |
application/pdf |
Pres File Name-M | pubs_serial_utirishbuffalocreek2011.pdf |
Full Text | ANNUAL REPORT FOR 2011 UT to Irish Buffalo Creek Mitigation Site Cabarrus County TIP No. R-2533B (Site 12) Prepared By: Natural Environment Unit & Roadside Environmental Unit North Carolina Department of Transportation September 2011 TABLE OF CONTENTS SUMMARY ........................................................................................................... 1 1.0 INTRODUCTION: ....................................................................................... 2 .1 Project Description .......................................................................... 2 .2 Purpose .......................................................................................... 2 .3 Project History ................................................................................. 2 .4 Debit Ledger .................................................................................... 2 2.0 STREAM ASSESSMENT: ......................................................................... 5 .1 Success Criteria ............................................................................. 5 .2 Stream Description .......................................................................... 5 .2.1 Post Construction Conditions .......................................................... 5 .2.2 Monitoring Conditions ..................................................................... 5 .3 Results of Stream Monitoring ......................................................... 6 .3.1 Site Data ......................................................................................... 6 3.0 VEGETATION ............................................................................................ 7 .1 Description of Species ..................................................................... 7 .2 Results of Vegetation Monitoring ..................................................... 7 .3 Conclusions .................................................................................... 7 4.0 OVERALL CONCLUSIONS/RECOMMENDATIONS ................................. 7 5.0 REFERENCES: ......................................................................................... 8 FIGURES Figure 1 – Site Location Map ............................................................................... 3 Figure 2 – Site #12 Map ....................................................................................... 4 TABLES Table 1 – Site #12 Morphological Summary ........................................................ 6 APPENDICES Appendix A – Cross Sections Appendix B – Site Photographs 1 SUMMARY The following report summarizes the stream monitoring activities that have occurred during the Year 2011 at the UT to Irish Buffalo Creek Stream Mitigation Site (permitted Site #12) in Cabarrus County. The North Carolina Department of Transportation (NCDOT) completed construction in March 2005. This report provides the monitoring results for the fourth formal year of monitoring (Year 2011). The Year 2011 monitoring period is the fourth of five scheduled years of monitoring on the UT to Irish Buffalo Creek Mitigation Site (See Success Criteria Section 2.1). Based on the overall conclusions of monitoring at permitted Site #12 for UT to Irish Buffalo Creek, it has met the required monitoring protocols for the fourth formal year of monitoring. The channel throughout the relocated stream is stable at this time. The streambank and buffer areas have planted vegetation surviving for the fourth year of monitoring. NCDOT proposes to discontinue stream monitoring at the UT to Irish Buffalo Creek Mitigation Site. 2 1.0 INTRODUCTION 1.1 Project Description The following report summarizes the stream monitoring activities that have occurred during the Year 2011 at the UT to Irish Buffalo Creek Stream Mitigation Site. Site # 12 is located on NC 49 in Cabarrus County at Sta. 11+040 to Sta. 11+230 –L1- RT. (Figure 1). The UT to Irish Buffalo Creek Site was constructed to provide mitigation for stream impacts associated with Transportation Improvement Program (TIP) number R-2533B in Cabarrus County. The mitigation site provided approximately 563 linear feet of stream restoration. Construction was completed during March 2005 by the NCDOT. Stream restoration involved the installation of cross vanes, coir fiber matting and live stakes along the streambank, and bareroot seedlings in the buffer area. 1.2 Purpose In order for a mitigation site to be considered successful, the site must meet the success criteria. This report details the monitoring in 2011 at the UT to Irish Buffalo Creek Mitigation Site. Hydrologic monitoring was not required for this site. 1.3 Project History March 2005 Construction Completed March 2008 Replanted Site September 2008 Stream Channel Monitoring (1 year) October 2009 Stream Channel Monitoring (2 year) October 2010 Stream Channel Monitoring (3 year) September 2011 Stream Channel Monitoring (4 year) 1.4 Debit Ledger The entire UT to Irish Buffalo Creek (Site #12) stream mitigation site was used for the R-2533B project to compensate for unavoidable stream impacts. 3 Figure 1. Site Location Map 4 Figure 2. Site #12 Map 5 2.0 STREAM ASSESSMENT 2.1 Success Criteria The following surveys were conducted in support of the monitoring assessment and in accordance with the regulatory permits obtained for this project: Stream Geomorphological Assessment ¨ The stream shall be monitored for a duration of five years from the end of construction (channel modifications and vegetation planted) ¨ The data shall be collected and submitted to the US Army Corps of Engineers and N.C. Division of Water Quality no later than January 1st each year for five years after construction ¨ At Site #12, 563 linear feet of stream channel will be relocated. A permanent cross section shall be established in a meander and at an inflection point along the channel. ¨ In order to evaluate the stability of the new channel, the channel cross section at each permanent station identified above shall be measured on a yearly basis for five years and width:depth ratio compared to the as-built cross section 2.2 Stream Description 2.2.1 Post-Construction Conditions The restoration of UT to Irish Buffalo Creek Site #12 involved installation of cross vanes, coir fiber matting and live stakes along the streambank, and bareroot seedlings in the buffer area. 2.2.2 Monitoring Conditions The objective of the UT to Irish Buffalo Creek Site #12 stream restoration was to build an E4b stream as identified in Rosgen’s Applied River Morphology. A total of two cross sections (one in a riffle and one in a pool) were surveyed. For this report, only cross sections containing riffles were used in the comparison of channel morphology presented below in Table 1 (Site #12). 6 Table 1. Abbreviated Morphological Summary (UT Irish Buffalo Site #12) Variable Proposed 2008 2009 2010 2011 Riffle Cross- Section #1 Riffle Cross- Section #1 Riffle Cross- Section #1 Riffle Cross- Section #1 Drainage Area (mi2) 0.1 0.1 0.1 0.1 0.1 Bankfull Width (ft) 5.4 5.6 6 6 5.58 Bankfull Mean Depth (ft) 1.2 0.5 0.5 0.5 0.4 Width/Depth Ratio 4.5 11.1 12 12 13.95 Bankfull Cross Sectional Area (ft2) 5.0 2.8 3 3 2.21 Maximum Bankfull Depth (ft) 1.5 1.09 1.1 1.1 1.1 Width of Floodprone Area (ft) 18.0 17.1 17.1 17.1 16.87 Entrenchment Ratio 3.3 3.1 2.9 2.9 3.03 * Riffle values are used for classification purposes, pool values are shown in Appendix A. 2.3 Results of the Stream Assessment 2.3.1 Site Data The assessment included the survey of two cross sections at Site #12. Longitudinal profile monitoring was not required per the permit conditions and therefore was not completed. All of the cross sections were established during the 2008 monitoring year. Cross section locations were determined based on choosing segments that were representative of the entire reach. The cross sections are shown in Appendix A. Site #12 Cross-Sections: ¨ Cross-Section #1: UT Irish Buffalo Creek Site #12, midpoint of riffle ¨ Cross-Section #2: UT Irish Buffalo Creek Site #12, midpoint of pool Based on comparisons of all four years of monitoring data, all of the cross sections appear stable with little or no active bank erosion. Graphs of the cross sections are presented in Appendix A. Future survey data will vary depending on actual location of rod placement and alignment; however, this information should remain similar in appearance. Pebble counts were not required per the permit conditions and therefore were not completed. 7 3.0 VEGETATION: UT to IRISH BUFFALO CREEK 3.1 Description of Species The following tree species were planted on the stream bank: Salix nigra, Black Willow Cornus amomum, Silky Dogwood Alnus serrulata, Tag Alder The following tree species were planted in the buffer area: Liriodendron tulipifera, Yellow Poplar Platanus occidentalis, Sycamore Quercus nigra, Water Oak Faxinus pennsylvanica, Green Ash 3.2 Results of Vegetation Monitoring Streambank & Buffer Vegetation: The stream was vegetated throughout with black willow, silky dogwood, tulip poplar, sycamore, green ash, water oak, winged elm, cottonwood, and various herbaceous species. In accordance with the permit conditions, only visual monitoring of the stream and buffer vegetation is required, therefore no vegetation plots were set at this site. 3.3 Conclusions There were no vegetation monitoring plots established throughout the buffer planting area. After the fourth year of monitoring, the UT Irish Buffalo Creek Mitigation Site shows by visual observation that the tree species planted in the streambank and buffer areas are surviving. NCDOT proposes to discontinue visual vegetation monitoring of this site. 4.0 OVERALL CONCLUSIONS/RECOMMENDATIONS The UT to Irish Buffalo Creek Mitigation Site has met the required monitoring protocols for the fourth formal year of monitoring. The channel throughout the relocated stream is stable at this time. The streambank and buffer have vegetation surviving for the fourth formal year of monitoring. NCDOT proposes to discontinue monitoring the UT to Irish Buffalo Creek Mitigation Site. 8 5.0 REFERENCES North Carolina Department of Transportation (NCDOT), November 19, 2001. Permit for R-2533A and R-2533B (Action ID.199702364). North Carolina Department of Transportation (NCDOT), November 26, 2001. Permit for R-2533A and R-2533B (DWQ Project No. 011274). Rosgen, D.L, 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, Colorado. US Army Corps of Engineers (USACE), 2003. Stream Mitigation Guidelines. Prepared with cooperation from the US Environmental Protection Agency, NC Wildlife Resources Commission, and the NC Division of Water Quality. APPENDIX A CROSS SECTIONS Site #12: Cross-Section #1 (Riffle) Abbreviated Morphological Summary 2008 2009 2010 2011 Bankfull Cross Sectional Area (ft2) 2.8 3 3.17 2.21 Maximum Bankfull Depth (ft) 1.1 1.1 1.19 1.1 Width of the Floodprone Area (ft) 17.1 17.1 17.54 16.87 Bankfull Mean Depth (ft) 0.5 0.5 0.55 0.4 Width/Depth Ratio 11.1 12 10.4 13.95 Entrenchment Ratio 3.1 2.9 3.07 3.03 Bankfull Width (ft) 5.6 6 5.72 5.58 Site #12: Cross-Section #2 (Pool) Abbreviated Morphological Summary* 2008 2009 2010 2011 Bankfull Cross Sectional Area (ft2) 2.8 3.9 3.69 3.12 Maximum Bankfull Depth (ft) 1.3 1.3 1.2 1.09 Bankfull Mean Depth (ft) 0.7 0.8 0.67 0.59 Bankfull Width (ft) 4.9 4.9 5.54 5.27 * According to the Rosgen Classification of Natural Rivers floodprone width, entrenchement ratio, and width depth ratio are not measured in pool, glide, or run features. APPENDIX B SITE PHOTOGRAPHS Cross Section #3 at Station 4+95.6 Cross Section #7 at Station 17+75.6 UT Irish Buffalo Creek Site #12 Photo Point #1 (Upstream) Photo Point #1 (Downstream) Photo Point #2 (Upstream) Photo Point #2 (Downstream) Overview Photo (Upstream) Overview Photo (Downstream) September 2011 |
OCLC number | 871561017 |