Water resources development plan |
Previous | 2 of 6 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
|
This page
All
|
North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources Development Plan Fiscal Years 2012-2017 July 1, 2011 Water Resources Development Plan Fiscal Years 2012 – 2017 Table of Contents Page No. Executive Summary .................................................................................................................................................................... i Federal Budget Information........................................................................................................................................................ ii I. Introduction ................................................................................................................................................................. 1 A. Authority and Purpose of Plan ................................................................................................................... 1 B. Organization and Project Categories ......................................................................................................... 1 C. Distribution of Plan ..................................................................................................................................... 1 D. Budget Recommendations ......................................................................................................................... 1 II. Project Lists A. Categories 1 and 2 ...................................................................................................................................... 2 B. Category 3.................................................................................................................................................... 3 C. Category 4.................................................................................................................................................... 5 D. Category 5.................................................................................................................................................... 5 III. Priorities A. Categories 1 and 2 ...................................................................................................................................... 5 B. Category 3.................................................................................................................................................... 5 C. Category 4.................................................................................................................................................... 6 D. Category 5.................................................................................................................................................... 6 IV. Project Information .................................................................................................................................................... 7 A. Categories 1 and 2 ...................................................................................................................................... 9 B. Category 3.................................................................................................................................................... 31 C. Category 4.................................................................................................................................................... 51 D. Category 5.................................................................................................................................................... 51 Appendix – G.S. 143-215.73A ..................................................................................................................................................... 52 ( This Page Intentionally Left Blank ) 1 WATER RESOURCES DEVELOPMENT PLAN I. Introduction A. Authority and Purpose of Plan General Statute 143-215.73A requires the Department of Environment and Natural Resources to prepare a statewide plan for water resources development projects. The plan lists projects proposed for a six-year period and is due by July 1 each year. The purpose of the plan is to give the Governor and the State Budget Director a long-range forecast of state funding needs for water resources development. The Governor can then use the plan to select and recommend projects for funding in the biennial budget. The plan also gives the members of the Advisory Budget Commission and the General Assembly a long-range forecast of state funding requirements for water resources development projects. The plan will provide them with information to use in their consideration of the Governor’s funding recommendations. B. Organization and Project Categories The plan has been written in three parts: 1) Project Listings; 2) Project Priorities and Funding Recommendations; and 3) Project Information. The first part contains a listing of all projects grouped under the five categories specified in part (b) of G.S. 143-215.73A. The second part shows the priority assigned to each project and whether or not it is recommended for funding, for deferral, or for elimination. The final section contains specific information on each project as required under G.S. 143-215.73A(d). C. Distribution of the Plan The Department of Environment and Natural Resources submits the plan to the Governor each year by July 1. The Governor also provides copies of the plan to the General Assembly along with her recommended biennial budget or her recommended revised budget for the second year of the biennium. D. Budget Recommendations This report includes the recommendations of the Department of Environment and Natural Resources as to which projects should be funded in the next biennial budget or in the revised budget for the second year of the biennium. The Governor chooses which of these projects, if any, will be included in her recommended biennial budget (or in the revised budget for the second year of the biennium). The budget document transmitted to the General Assembly by the Governor identifies the water resources development projects recommended for funding. 2 II. Project Lists A. Category 1 and Category 2: Water Resources Development Projects Approved by Congress and Projects for Which Congress has Appropriated Funds Investigations Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding AIWW, Snows Cut, NC (Section 216) Yes No Bald Head Island, NC Yes No Bogue Banks, NC Yes Yes Cape Fear River, NC above Wilmington (Sec 216) Yes No Carolina Beach (Sec 216) (Carolina Beach Portion) Yes No Currituck Sound, NC Yes Yes John H. Kerr Dam and Reservoir, VA & NC (Sec 216) Yes Yes Neuse River Basin, NC (PED) Yes Yes Princeville, NC Yes Yes Surf City and North Topsail Beach, NC Yes Yes Tar River and Pamlico Sound, NC Yes Yes Wilmington Harbor (Section 216) Yes No Wilmington Harbor Improvements Feasibility Yes Yes Construction Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding Brunswick Co. Beaches (Ocean Isle), NC Yes Yes Brunswick Co. Beaches GRR (Oak Island / Caswell / Holden), NC Yes Yes Carolina Beach and Vicinity, NC (Carolina Beach) Yes Yes Carolina Beach and Vicinity, NC (Area South – Kure Beach) Yes Yes Dare Co. Beaches (Bodie Island), NC Yes Yes John H. Kerr Dam and Reservoir (Major Rehab) Yes Yes West Onslow Beach (Topsail Island), NC Yes Yes Wilmington Harbor Deepening, NC Yes Yes Wrightsville Beach, NC Yes Yes Operation and Maintenance Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding Atlantic Intracoastal Waterway, NC Yes Yes B. Everett Jordan Dam and Lake, NC Yes Yes Beaufort Harbor, NC Yes Yes Far Creek, NC Yes Yes Manteo (Shallowbag) Bay, NC Yes Yes Morehead City Harbor, NC Yes Yes Silver Lake Harbor, NC Yes Yes Stumpy Point Bay, NC Yes Yes Wilmington Harbor 42 Foot, NC Yes Yes 3 Continuing Authorities Program Study / Project "Named" by US Congress Project which the US Congress has appropriated funding Belhaven Harbor Environmental Improvements, NC (Sec 1135) Yes Yes Concord Streams Restoration, NC (Sec 206) Yes Yes Manteo, Old House Channel (Sec. 204) Yes Yes Wilson Bay Restoration, NC (Sec 206) Yes Yes B. Category 3: Water Resources Development Projects for Which Grant Applications have been Submitted Under Part 8 of Article 21 of Chapter 143 of the General Statutes Project Sponsor County Asheville Stormwater Study City of Asheville Buncombe Avery County High School Stormwater Wetland Avery County School Board Avery Bald Creek Restoration (SS) Haywood Soil and Water Haywood Banner Elk Elementary School SW Wetland & Stream Restoration Town of Banner Elk Avery Bear Creek DD #1 Water Management Wayne Co. Drainage District #1 Wayne Beaufort Regional Health Water Management Beaufort Regional Health System Beaufort Big Creek Restoration Phase 2 (PS) Surry Soil and Water Surry Big Hungry River Dam Removal Phase 2 Wildlife Resources Commission Henderson Boone Fork and Watauga River Restoration (HS) Watauga County Watauga Bowlin-Peak Creek Stream Restoration New River Soil and Water Ashe Calico Bay Drainage Pender County Pender Calypso Drainage Project Town of Calypso Duplin Carolina Beach Access Phase 3 Town of Carolina Beach New Hanover Catawba Water Management Study Catawba Wateree Water Mgmt. Group Mecklenburg Chicod Creek Snagging Pitt County Pitt Cold Water Creek Restoration Cabarrus Soil and Water Cabarrus Colington Harbor Entrance Channel Phase 7 Dare County Dare Connestee Falls Park Transylvania County Transylvania Contentnea Creek Water Management Greene County Greene County-wide NPS GIS Evaluation Madison Soil and Water Madison Coweeta Creek Restoration (CS) Macon Soil and Water Macon Cub Creek Park Bioretention Project Town of Wilkesboro Wilkes Dogwood Park Phase 2 Village of Wesley Chapel Union East Sugarloaf Island Groin Town of Morehead City Carteret Elm Grove Water Management Bertie County Bertie French Broad River Restoration (GAES) Transylvania Soil and Water Transylvania French Broad River Restoration (PS) Transylvania Soil and Water Transylvania Goshen Swamp Water Management Duplin Soil and Water Duplin Greenevers Water Management Town of Greenevers Duplin Indian Grave Creek Restoration Town of Kenansville Duplin Irish Creek Restoration (SS) Burke Soil and Water Burke Island Creek (and tributaries) Water Management Duplin County Duplin Little Fisher River Restoration Surry Soil and Water Surry Little Fork Creek Restoration State (Division of Forest Resources) Wilkes 4 Livingston Creek Water Management Columbus County Columbus Lumber River Snagging Phase 4 Lumber River COG Robeson Mars Hills Elementary Water Management Madison Soil and Water Madison Mill Branch Drainage Pender County Pender Mitchell River Restoration Surry Soil and Water Surry Mitchell River Wetland Restoration Surry Soil and Water Surry MST Park (FS and Land Acquisition) Phase 2 Town of Clayton Johnston Nags Head Beach Protection Town of Nags Head Dare Obids Creek Restoration New River Soil and Water Ashe Ocean Isle Beach Stormwater Town of Ocean Isle Beach Brunswick Pine Level Drainage Town of Pine Level Johnston Polk County Courthouse Water Management Town of Columbus Polk Riverview Acres Navigation Phase 2 Pasquotank County Pasquotank Roscoe Creek Drainage Pender County Pender Saddle Mountain Creek Restoration Surry Soil and Water Surry Shoal Creek Restoration (MS) Yancey Soil and Water Yancey Shuford Mills (Brookford) Dam removal project. Catawba Soil and Water Catawba Sills Creek Drainage Pender County Pender Skewarkee Trail Stormwater Management Town of Williamston Martin South Hominy Creek Restoration (IS) Buncombe Soil and Water Buncombe Southern H.S. Water Mgmt. Design Phase 2 Durham Soil and Water Durham Southern Shores Dredging Phase 3 Town of Southern Shores Dare Stewarts Creek Restoration Surry Soil and Water Surry Stewarts Creek Water Management Duplin County Duplin Trent River Navigation Phase 3 Jones County Jones Tuckerhole Creek Stream Restoration Town of Wilkesboro Wilkes UT Kings Creek Restoration (LS) Caldwell Soil and Water Caldwell Vance Dam Removal and Rose Ck. Stabilization Mitchell Soil and Water Mitchell Wallace Storm Drainage Phase 2 Town of Wallace Duplin Walnut Street Culvert Water Management City of Lumberton Robeson Wendell Stormwater Study - Lake Dr. Catchment Town of Wendell Wake West Montgomery High Water Management Montgomery County Board of Education Montgomery West Pine Swamp Creek Restoration New River Soil and Water Ashe Western NC Nature Center Water Management City of Asheville Buncombe White Oak Branch Drainage Pender County Pender Woodfin Greenway Trail & Stream Enhancement Town of Woodfin Buncombe Zack Circle Stormwater City of Jacksonville Onslow 5 C. Category 4: Water Resources Development Projects for Which Grant Applications have been Submitted Under Article 4 of Chapter 139 of the General Statutes None at this time D. Category 5: Water Resources Development Projects Planned as Federal Reservoir Projects but for Which no Federal Funds are Scheduled and for Which Local Governments are Seeking State Financial Assistance None at this time III. Priorities for projects planned for FY 2011-2012 A. Priority recommendations for Water Resources Development Projects approved by Congress and projects for which Congress has appropriated funds. One project deferred – Tar River and Pamlico Sound Investigation. No projects recommended for elimination in FY 2011-2012. Priority Name of Project State Funds Recommended Reason 1 Wilmington Harbor Deepening $600 Navigation Benefits 2 Wilmington Harbor Maintenance 200 Navigation Benefits 3 Morehead City Harbor Maintenance 100 Navigation Benefits 4 B. Everett Jordan Water Supply 200 Water Supply Benefits 5 Wilmington Harbor Improvements Feasibility Study 93 Navigation Benefits 6 Bogue Banks Shore Protection Study 87 Beach Protection Benefits 7 John H. Kerr Dam and Reservoir (Sec 216) 100 Environmental Benefits 8 Belhaven Harbor (Sec 1135) 17 Environmental Benefits 9 Manteo Old House Channel (Sec 204) 1250 Environmental Benefits 10 Concord Stream Restoration (Sec 206) 35 Environmental Benefits 11 Wilson Bay Restoration (Sec 206) 105 Environmental Benefits 12 Planning Assistance to Communities 50 Environmental Benefits 13 Neuse River Basin PED 300 Environmental Benefits 14 Currituck Sound Water Management Study 275 Environmental Benefits 15 Princeville Flood Control 200 Flood Protection Benefits 16 Surf City/N. Topsail Beach Protection 116 Beach Protection Benefits 17 West Onslow Beach (Topsail Island) Study $123 Beach Protection Benefits Sub-Total = $3,851 B. Priority recommendations for Water Resources Development Projects for which Local Governments have submitted grant applications under G.S. 143-215.71 *. 33 projects recommended for deferral in FY 2011-2012. No projects recommended for elimination in FY 2011-2012. (Amounts in Thousands) Priorit y Name of Project State Funds Recommende d Reason 1 Aquatic Plant Control, Statewide and Lake Gaston $300 Environmental benefits 2 Shuford Mills (Brookford) Dam Removal 98 Environmental benefits 3 Dogwood Park Phase 2 127 High local recreational benefits 4 Carolina Beach Access Phase 3 71 High local recreational benefits 5 Big Hungry River Dam Removal Phase 2 100 Environmental benefits 6 MST Park (FS & Land Acquisition) Phase 2 193 High local recreational benefits 7 Southern H.S. Water Mgmt. Design Phase 2 90 Environmental benefits 8 Wendell Stormwater Study - Lake Dr. Catchment 5 Environmental benefits 9 Cub Creek Park Bioretention Project 40 Environmental benefits 6 10 Avery County High School Stormwater Wetland 175 Environmental benefits 11 South Hominy Creek Restoration (IS) 109 Environmental benefits 12 Ocean Isle Beach Stormwater 95 Environmental benefits 13 Stewarts Creek Restoration 138 Environmental benefits 14 Connestee Falls Park 167 High local recreational benefits 15 Western NC Nature Center Water Management 87 Environmental benefits 16 West Montgomery High Water Management 78 High local recreational benefits 17 Boone Fork and Watauga River Restoration (HS) 117 Environmental benefits 18 Shoal Creek Restoration (MS) 40 Environmental benefits 19 Bowlin-Peak Creek Stream Restoration 34 Environmental benefits 20 Irish Creek Restoration (SS) 18 Environmental benefits 21 Coweeta Creek Restoration (CS) 25 Environmental benefits 22 Big Creek Restoration Phase 2 (PS) 10 Environmental benefits 23 Mitchell River Wetland Restoration 56 Environmental benefits 24 French Broad River Restoration (GAES) 28 Environmental benefits 25 Tuckerhole Creek Stream Restoration 241 Environmental benefits 26 Obids Creek Restoration 240 Environmental benefits 27 UT Kings Creek Restoration (LS) 45 Environmental benefits 28 Trent River Navigation Phase 3 31 High local recreational benefits 29 Polk County Courthouse Water Management 139 Environmental benefits 30 Mitchell River Restoration 56 Environmental benefits 31 Little Fork Creek Restoration 319 Environmental benefits 32 West Pine Swamp Creek Restoration 138 Environmental benefits 33 Bald Creek Restoration (SS) 70 Environmental benefits 34 Vance Dam Removal and Rose Creek Stabilization 75 Environmental benefits 35 Little Fisher River Restoration 112 Environmental benefits 36 French Broad River Restoration (PS) 90 Environmental benefits 37 Banner Elk Elementary School SW Wetland & Stream Restoration 229 Environmental benefits 38 Catawba Water Management Study 38 Environmental benefits 39 Lumber River Snagging Phase 4 63 State paddle trail and recreational benefits 40 Saddle Mountain Creek Restoration $22 Environmental benefits Sub-Total = $4,109 * Priority projects as of June 1, 2011, list is subject to change if any additional submittals are made prior to July 1, 2011 grant application deadline. Note that there is no federal cost-share associated with these projects. C. Water Resources Development Projects For Which Grant Applications Have Been Submitted Under G.S. 139-54 No grant applications received, no projects recommended for deferral or elimination in FY 2011-2012. D. Water Resources Development Projects Planned as Federal Reservoir Projects but for Which Local Governments are Seeking State Financial Assistance No request received, no projects recommended for deferral or elimination in FY 2011-2012. 7 IV. Project Information This section of the Water Resources Development Plan contains the information required by G.S. 143-215.73A(d) for each project listed in Section II, Project Listing. Information for each project is presented in alphabetical order by category. A. Project Information, Categories 1 and 2, Water Resources Development Projects Approved by Congress and Water Resources Development Projects for which Congress has Appropriated Funds. Project Name Page No. Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging 9 AIWW, Snows Cut, New Hanover County, Section 216 9 B. Everett Jordan Lake Water Supply Storage 10 Bald Head Island Beach Renourishment 10 Beaufort Harbor Maintenance Dredging 11 Belhaven Harbor Environmental Improvements, Section 1135 11 Bogue Banks Beach Protection 12 Brunswick County Beaches – Ocean Isle Beach 12 Brunswick County Beaches – Oak Island, Caswell and Holden Beaches 13 Cape Fear River Above Wilmington, Section 216 13 Carolina Beach, New Hanover County, Section 216 14 Carolina Beach Renourishment, New Hanover County 14 Carolina Beach South (Kure Beach) Renourishment, New Hanover County 15 Concord Stream Restoration, Cabarrus County, Section 206 15 Currituck Sound Environmental Restoration 16 Dare County Beaches 16 Far Creek Maintenance Dredging, Hyde County 17 John H. Kerr Dam and Reservoir, Section 216 17 Manteo, Old House Channel, Dare County, Section 204 18 Manteo Shallowbag Bay Maintenance Dredging, Dare County 18 Morehead City Harbor Dredging, Carteret County 19 Neuse River Basin Investigation 19 Planning Assistance to North Carolina Communities 20 Princeville Flood Control Study 20 Silver Lake Harbor, Ocracoke, Hyde County 21 Stumpy Point Bay Maintenance Dredging, Dare County 21 Surf City – North Topsail Beach Restoration, Pender County 22 Tar River and Pamlico Sound Investigation 22 West Onslow Beach – Topsail Beach, Pender County 23 Wilmington Harbor Deepening, New Hanover and Brunswick Counties 23 Wilmington Harbor 42-Ft. Project, New Hanover and Brunswick Counties 24 Wilmington Harbor Improvement Feasibility Study, NC 24 Wilmington Harbor, Section 216 25 Wilson Bay Restoration, Onslow County, Section 206 25 Wrightsville Beach Renourishment, New Hanover County 26 Propose projects in the USACE – Wilmington District 27 8 ( This Page Intentionally Left Blank ) Project Name Description Total Cost as of June 30, 2011 Federal* State Local Total $ 2 0,944,000 $ 3 ,230,650 $ 7 33,736 $ 24,908,386 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 18,148,000 $ - $ - Federal State Local FY 2012 $ 3 ,148,000 $ - $ - FY 2013 $ 3 ,000,000 $ - $ - FY 2014 $ 3 ,000,000 $ - $ - FY 2015 $ 3,000,000 $ - $ - FY 2016 $ 3,000,000 $ - $ - FY 2017 $ 3,000,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,300,000 $ 600,000 $ 600,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ - $ - $ - ATLANTIC INTRACOASTAL WATERWAY (AIWW) MAINTENANCE DREDGING ATLANTIC INTRACOASTAL WATERWAY (AIWW), SNOWS CUT (SECTION 216) The AIWW navigation channel runs 308 miles from the Virginia state line to the South Carolina state line through Currituck, Camden, Dare, Tyrrell, Hyde, Beaufort, Pamlico, Carteret, Onslow, Pender, New Hanover, and Brunswick Counties. In the past, the Wilmington District, Corps of Engineers has had sufficient funds to keep this channel dredged to its authorized depth of -12 feet, mean low water. However, several times in the last decade, the District has not had sufficient funds to perform this dredging. In order to keep the AIWW open for both commercial and recreational boat traffic, the State of North Carolina has provided funds to the Wilmington District so that they could hire a dredging contractor to do the dredging. N/A Ongoing Estimated Completion Date * Federal "Total Cost" is estimate for last 10 years Awaiting federal funding Estimated Completion Date FY 2017, if funded in FY 2013 Status of Project 9 Status of Project Construction of Snow’s Creek Cut allowed salt water from Myrtle Grove Sound to enter the Cape Fear River estuary near its midpoint. This has had far reaching effects on the physical, chemical, and biological functioning of the estuary. High salt content has manifested itself with timber die-off, which is present throughout many of the freshwater swamps above Wilmington. In addition, it has resulted in increased current and projected future costs to industries in the upper estuary due to increased monitoring and modifications of their facilities in order to cope with increasing salt loads. Reduction in the amount of introduced salts, which serve to flocculate riverine sediments in the area, could also result in substantial reduction of maintenance dredging at Military Ocean Terminal Sunny Point. The Corps has proposed a Section 216 study on the salt water intrusion problem in the Cape Fear River estuary, of which Snow’s Cut has a role. The Corps would begin a reconnaissance study in FY 2013 to determine whether it is in the Federal interest to do this study. The U.S. Congress has not approved funding for this study and the non-federal sponsor is yet to be determined. Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ 1,327,312 $ 2,841,994 $ 4,169,306 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ 1,178,000 $ 674,000 O & M $ - $ 222,000 $ 108,000 Federal State Local FY 2012 $ - $ 200,000 $ 355,000 FY 2013 $ - $ 200,000 $ 355,000 FY 2014 $ - $ 250,000 $ 18,000 FY 2015 $ - $ 250,000 $ 18,000 FY 2016 $ - $ 250,000 $ 18,000 FY 2017 $ - $ 250,000 $ 18,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 500,000 $ 250,000 $ 250,000 FY 2015 $ 500,000 $ 250,000 $ 250,000 FY 2016 $ 500,000 $ 250,000 $ 250,000 FY 2017 $ - $ - $ - On hold, awaiting action by Congress 10 Estimated Completion Date Status of Project B. EVERETT JORDAN LAKE WATER SUPPLY BALD HEAD ISLAND BEACH RENOURISMENT, BRUNSWICK COUNTY The Village of Bald Head Island has requested that the Wilmington District, U.S. Army Corps of Engineers, perform a feasibility study on a shore protection project for the portions of its beach that are experiencing severe erosion. If directed by the U.S. Congress, the Wilmington District will perform a reconnaissance study, funded entirely with federal monies, in Fiscal Year 2013. If the reconnaissance study shows that there is a federal interest in doing this project, a cost-shared feasibility study will likely begin in Fiscal Year 2014. Unknown at this time N/A Ongoing Estimated Completion Date Status of Project B. Everett Jordan Lake is a U.S. Army Corps of Engineers' multipurpose reservoir that became operational in 1983. The water supply storage in the lake was included at the request of the State of North Carolina and was done with the understanding that the actual users of the water would repay the Corps the costs of including the water supply storage and the portion of the annual operating and maintenance costs associated with that storage. The General Statute GS 143- 354(a)(11) of the State of North Carolina gives the Environmental Management Commission (EMC) the authority to allocate to local governments any water supply storage held by the State in Federal reservoirs. The estimated safe yield of the 45,800 acre-feet of water supply storage is 100 million gallons per day. As of May 2007 the EMC has allocated 63 percent of that storage as follows: Level I allocations: Towns of Cary and Apex, Chatham County, City of Durham, Town of Morrisville, and Wake County - RTP South.; and Level II allocations: Town of Holly Springs, Orange County, and Orange Water & Sewer Authority. Both the State and the local government allocation holders are paying their proportionate shares of the interest on the cost of the water supply storage, plus their share of the O&M and major rehabilitation cost. In addition, local government allocation holders using Jordon Lake water are also paying off the principle. The initial principle amount was $4,388,000; as of March 1, 2011 the current remaining balance to be paid is $1,928,878 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 1,250,000 $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 250,000 $ - $ - FY 2014 $ 250,000 $ - $ - FY 2015 $ 250,000 $ - $ - FY 2016 $ 250,000 $ - $ - FY 2017 $ 250,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 230,000 $ - $ 130,000 $ 360,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 100,000 $ 17,000 $ 17,000 O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ 17,000 $ 17,000 FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - 11 Status of Project BEAUFORT HARBOR MAINTENANCE DREDGING, CARTERET COUNTY BELHAVEN HARBOR ENVIRONMENTAL IMPROVEMENTS (BEAUFORT COUNTY) (SECTION 1135) This Corps of Engineers navigation project is located at the Town of Beaufort. The project consists of five segments: (1) the 15-foot deep Bulkhead Channel from the Town to Beaufort Inlet; (2) the 15-foot deep Gallants Channel from the Town north to the Newport River; (3) the 15-foot deep Taylor’s Creek Channel from the Town east to the North River and Back Sound; (4) the 12-foot deep Town Creek Channel and Basin north of Beaufort; and (5) the 14-foot Morgan Creek Channel and Basin. Carteret County, the non-Federal sponsor. N/A Next maintenance scheduled for FY2012 Estimated Completion Date The proposed project will replace and upgrade the existing breakwaters that protect the harbor and waterfront of Belhaven, NC. The existing breakwaters consist of northern and southern structures, each about 1900 feet long, at the entrance to Pantego Creek, separated by a central 500 foot navigation opening. The existing structures have many openings that allow water to pass through with little abatement. In the Spring of 2009, the Wilmington District, Corps of Engineers, received $3,250,000 in Disaster Supplemental funds to replace the existing structure with a new timber structure. This work will be done in FY 2011. The Corps is also studying the addition of submerged reefs in the lee (harbor side) of both breakwaters. These reefs would improve the estuarine habitat and also increase sheltering of the harbor from waves, and if funded, could be constructed in FY 2013 The Corps plans to complete the replacement of the timber breakwater in 2011 and, if funded, the reef construction in 2013. Estimated Completion Date FY 2013 Status of Project Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 2,513,000 $ 1,249,250 $ 1,031,000 $ 4,793,250 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 710,000 $ 546,000 $ 545,000 Construction $ 31,150,000 $ 8,202,000 $ 8,202,000 O & M Federal State Local FY 2012 $ 174,000 $ 87,000 $ 87,000 FY 2013 $ 186,000 $ 284,000 $ 283,000 FY 2014 $ 350,000 $ 175,000 $ 175,000 FY 2015 $ 250,000 $ 50,000 $ 50,000 FY 2016 $ 900,000 $ 75,000 $ 75,000 FY 2017 $ 30,000,000 $ 8,077,000 $ 8,077,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 14,190,570 $ 5,361,538 $ 2,279,538 $ 21,831,646 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 7,650,000 $ 1,886,000 $ 1,886,000 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 300,000 $ - $ - FY 2014 $ 3,500,000 $ 943,000 $ 943,000 FY 2015 $ - $ - $ - FY 2016 $ 350,000 $ - $ - FY 2017 $ 3,500,000 $ 943,000 $ 943,000 The Corps feasibility study should be complete in FY 2013. Preliminary engineering and design should begin in FY 2013 Estimated Completion Date Status of Project 12 Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project BOGUE BANKS BEACH PROTECTION, CARTERET COUNTY BRUNSWICK COUNTY BEACHES (OCEAN ISLE), NC This Corps of Engineers project is located in the Town of Ocean Isle Beach and provides for hurricane-wave protection and beach erosion control along the oceanfront. A levee consisting of a continuous vegetated dune and high beach berm stabilized by periodic nourishment has been constructed. The dune crown width is 25 feet at elevation 20 feet above mean sea level fronted by a storm berm having a width of 50 feet at elevation 15 feet above mean sea level for a distance of 28,000 feet. This project was approved as a new construction start in fiscal year 2000’s budget and was constructed in 2001. Beach was renourished in FY 2010. Bogue Banks is the barrier island in Carteret County located between Beaufort Inlet to the east and Bogue Inlet to the west. The communities of Pine Knoll Shores, Salter Path, Indian Beach, and Emerald Isle have experienced considerable erosion to the dune system and severe damage to upland structures due to recent hurricanes. Carteret County is requesting 50 percent cost-sharing of the non-Federal cost of the feasibility study for the Bogue Banks Shore Protection project that would be done by the Corps of Engineers. The Corps plans to complete the feasibility study in FY13, do preliminary engineering and design work in FY 13 and 14, and then do the nourishment of the beaches in FY 15, 16 and 17. FY 2051 FY 2018 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 6,933,000 $ 301,000 $ 7,234,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 37,996,000 $ 9,430,000 $ 9,430,000 O & M Federal State Local FY 2012 $ 346,000 $ - $ - FY 2013 $ 350,000 $ - $ - FY 2014 $ 500,000 $ - $ - FY 2015 $ 900,000 $ - $ - FY 2016 $ 900,000 $ - $ - FY 2017 $ 35,000,000 $ 9,430,000 $ 9,430,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ 300,000 $ 150,000 $ 150,000 GRR is expected to be completed in 2012; plans and specs will be done in 2014, and initial beach nourishment in FY 2017 Estimated Completion Date Status of Project 13 Awaiting federal funding Estimated Completion Date Status of Project BRUNSWICK COUNTY BEACHES – OAK ISLAND, CASWELL AND HOLDEN BEACHES CAPE FEAR RIVER ABOVE WILMINGTON, SECTION 216 The Wilmington District, Corps of Engineers, proposes to investigate the operation of the Federal navigation channels and locks in the Cape Fear River above Wilmington. The Corps would begin a reconnaissance study in FY 2013 to determine whether it is in the Federal interest to do this study. No state or local matching funds are required. The study will determine if the Corps should continue to operate the lock and dam in the future. The U.S. Congress has not approved funding for this study and the non-federal sponsor is yet to be determined. This Corps of Engineer project will protect these beaches through the construction of continuous storm berms and dunes along their ocean shorelines. The Wilmington District is investigating what the most effective dimensions of these berms and dunes should be through the preparation of a General Re-evaluation Report (GRR). They hope to complete the GRR in 2012. If that is the case, then initial construction would occur in Fiscal Year 2017, and re-nourishments would occur at three- to four-year intervals for the life of this project. The cost-sharing would initially be 65 percent Federal, 35 percent non-Federal, but then switch to 50–50 for all re-nourishments. The costs shown for construction and re-nourishments are general estimates. FY 2017, if funded in FY 2013 FY 2067 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,100,000 $ 500,000 $ 500,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 500,000 $ 250,000 $ 250,000 FY 2015 $ 500,000 $ 250,000 $ 250,000 FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 30,130,142 $ 11,518,462 $ 4,705,462 $ 46,354,065 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 3,134,000 $ 789,900 $ 789,900 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 200,000 $ - $ - FY 2014 $ 2,934,000 $ 789,900 $ 789,900 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Awaiting federal funding Estimated Completion Date Status of Project 14 Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project CAROLINA BEACH, NEW HANOVER COUNTY, SECTION 216 CAROLINA BEACH RENOURISHMENT, NEW HANOVER COUNTY This Corps of Engineers project is located in the Town of Carolina Beach, about 15 miles south of Wilmington. The project provides for restoring the dune with a base generally bordering at or near the building line. The dune dimensions are a crown width of 25 feet at an elevation of 15 feet above mean low water together with an integral beach berm with a crown width of 50 feet at elevation 12 feet. Beach fill extends about 14,000 feet from the northern to the southern limits of Carolina Beach. Along the northern 2,050 feet, the project includes a rock revetment at elevation 12 feet fronted by 130-foot wide berm at elevation 8 feet. Federal participation in the cost of beach renourishment will run for a period not to exceed 50 years from year of initial placement (1965-2015). The Carolina Beach portion of this project is located in New Hanover County, NC, about 15 miles southeast of Wilmington, NC, on the peninsula which separates the lower Cape Fear River from the Atlantic Ocean. It includes a dune with a crown width of 25 feet at an elevation of 13.5 feet, with an integral beach berm with a crown width of 50 feet at elevation 10.5 feet and beach fill extending about 14,000 feet from the northern to southern limits of Carolina Beach. Local interests desire evaluation of the coastal storm damage reduction project to determine the feasibility of extending the authorization to continue to nourish this portion of the project past FY 2015. FY 2015 FY 2015, if funded in FY 2013 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 19,496,140 $ 7,280,461 $ 3,217,461 $ 29,994,062 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 2,450,000 $ 606,000 $ 606,000 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 200,000 $ - $ - FY 2014 $ 2,250,000 $ 606,000 $ 606,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 322,000 $ 140,000 $ 140,000 $ 602,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 3,014,000 $ 59,000 $ 59,000 O & M $ - $ - $ - Federal State Local FY 2012 $ 125,000 $ 35,000 $ 35,000 FY 2013 $ 2,785,000 $ 24,000 $ 24,000 FY 2014 $ 104,000 $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project 15 Construction began in FY 2011 Estimated Completion Date Status of Project CAROLINA BEACH SOUTH, NEW HANOVER COUNTY CONCORD STREAM RESTORATION (SECTION 206), CABARRUS COUNTY Restoration and rehabilitation are proposed for four stream segments in Concord: Three Mile Branch (approximately 8,000 feet), Afton Run (5,800 feet), Stricker Branch (approximately 5,500 feet), and Academy Center Branch (4,000 feet). The watersheds of the four streams are experiencing rapid residential and commercial development that has led to a variety of negative impacts on the subject streams, including slope failures, bank erosion, high in-stream sediment loadings, and loss of vegetated riparian buffers. The project would consist of stream channel reconstruction where feasible, restoration of riparian buffers, construction of natural marsh catchments, and purchase of existing wildlife corridors. In addition, aquatic habitat will be restored through the installation of in-stream habitat improvement structures. The City of Concord is the non-federal sponsor. This Corps of Engineers hurricane protection project is being constructed south of Carolina Beach in front of developments known as Wilmington Beach and Kure Beach. It provides for construction of a dune with a base generally bordering at or near the building line with a crown width of 25 feet at an elevation of 13.5 feet above mean low water and a beach berm 50 feet wide at elevation 9.0 feet above mean low water, extending 18,000 feet from the southern limits of Carolina Beach. Federal participation in the cost of beach nourishment will not exceed 50 years from year of initial placement, which was April of 1998. The Town of Kure Beach is the non-Federal sponsor of this project. FY 2014 FY 2047 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,366,000 $ 1,151,000 $ - $ 2,517,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 283,000 $ 499,000 $ - Construction $ 20,750,000 $ 11,034,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 400,000 $ 400,000 $ - FY 2013 $ 183,000 $ 183,000 $ - FY 2014 $ 450,000 $ 150,000 $ - FY 2015 $ 10,000,000 $ 5,400,000 $ - FY 2016 $ 10,000,000 $ 5,400,000 $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of March 31, 2010 Federal State Local Total $ 4,169,000 $ 242,000 $ 81,000 $ 4,492,000 Estimated costs from 07/01/2010 through 06/30/2016 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ - $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Feasibility Study is on-going Estimated Completion Date Status of Project 16 Preliminary engineering and design is on hold indefinitely Estimated Completion Date Status of Project CURRITUCK SOUND ENVIRONMENTAL RESTORATION DARE COUNTY BEACHES The Corps of Engineers has completed a detailed feasibility study of a 20-mile long section of beach from the northern limits of Dare County to just south of Nags Head. The area, which is largely developed, has experienced erosion and damages as a result of recent storms and hurricanes. The study has located sand sources that could be used for beach nourishment. The Corps recommends that the initial nourishment be done on approximately 13.5 miles of beach in three phases over a three-year period. The design cost-sharing agreement between Dare County and the Corps of Engineers was signed in July 2001. The project cooperation agreement was executed in September 2004. The lack of Federal funding has delayed the start of the project. Project is currently on hold. Currituck Sound is a 153 square mile brackish water estuary separated from the Atlantic Ocean by the Outer Banks. A recent increase in salinity levels has caused a severe decline in many freshwater fisheries (largemouth bass, black crappie, and bluegill). Also, there has been a significant loss of submerged aquatic vegetation. The Corps, in partnership with the State of North Carolina has begun an investigation to determine the specific causes of the decline in species mentioned above and the necessary actions to restore the Sound. If the study finds a feasible solution, implementation would begin in FY 14. N/A FY 2016 Project Name Description Total Cost as of June 30, 2011 Federal State* Local* Total $ - $ 220,694 $ 48,923 $ 269,617 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 925,000 $ 155,000 $ 155,000 Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 925,000 $ 155,000 $ 155,000 FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,969,186 $ 1,423,186 $ 3,392,372 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 279,000 $ 279,000 Construction $ 1,125,000 $ 375,000 O & M Federal State Local FY 2012 $ 365,000 $ 307,500 $ - FY 2013 $ 300,000 $ 100,000 $ - FY 2014 $ 300,000 $ 100,000 $ - FY 2015 $ 300,000 $ 100,000 $ - FY 2016 $ 139,000 $ 46,500 $ - FY 2017 $ - $ - $ - FAR CREEK MAINTENANCE DREDGING, HYDE COUNTY JOHN H. KERR DAM AND RESERVOIR, NC & VC SECTION 216 STUDY John H. Kerr Reservoir is operated by the Corps of Engineers for flood control, hydropower, recreation, and water releases to enhance striped bass spawning in the Roanoke River. The storage and release of water at Kerr Dam affects agriculture, forestry, wildlife, water quality, and industrial water use in the entire lower Roanoke Basin. The State of North Carolina, the Commonwealth of Virginia, and the Corps of Engineers are sponsoring a study of the operation of Kerr Lake to see if the economic and environmental benefits from the lake can be increased. At the end of the study it is anticipated that both structural and non-structural measures will be taken to improve the operation of John H. Kerr Dam. Preliminary engineering and design of these measures would begin in FY 2013. This project involves the maintenance dredging of the navigation channel in Far Creek, which runs from the village of Engelhard to Pamlico Sound. The channel is used by commercial fishing boats that dock in the basin at Engelhard. The channel is 12 feet deep and 100 feet wide. The non-Federal cost is required to prepare the dredged material disposal site. Hyde County is the non-federal sponsor of the project. The next maintenance dredging of the channel is expected to be required in FY 2013. FY 2016 N/A Dike construction in support channel dredging scheduled for FY 2013 Estimated Completion Date Status of Project 17 Feasibility scheduled for completion in FY 2012, if funding available Estimated Completion Date *State and Local expenditures since 2004 Status of Project Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 250,000 $ - $ - $ 250,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 360,000 $ - $ - Construction $ 1,940,000 $ 1,250,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 2,300,000 $ 1,250,000 $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State* Local Total $ - $ 14,312,043 $ - $ 14,312,043 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 46,300,000 $ 7,000,000 $ - Federal State Local FY 2012 $ 3,300,000 $ - $ - FY 2013 $ 8,000,000 $ 2,000,000 $ - FY 2014 $ 8,300,000 $ 2,000,000 $ - FY 2015 $ 8,600,000 $ 2,000,000 $ - FY 2016 $ 8,900,000 $ - $ - FY 2017 $ 9,200,000 $ 1,000,000 $ - FY 2013, if funded 2012 Awaiting federal funding Estimated Completion Date Status of Project 18 Ongoing Estimated Completion Date *State expenditures since 2001 Status of Project MANTEO, OLD HOUSE CHANNEL, SECTION 204, DARE COUNTY MANTEO (SHALLOWBAG BAY) MAINTENANCE DREDGING, DARE COUNTY As part of the maintenance dredging of the navigation channel going from Oregon Inlet to Wanchese Harbor, the Corps of Engineers must provide environmentally sound spoil disposal sites. As the non-Federal sponsor of this channel, the state is required to pay for preparation of the spoil disposal sites, which involves the raising of dikes around a spoil disposal island (Island H). The Corps pays for 100% of the dredging costs. In addition to the channel from Oregon Inlet to Wanchese Harbor, there are two other channels—the Manteo to Wanchese and the North—that are a part of this project. Because the Corps views these projects as primarily recreational, it has not maintained them. Because of this policy, the state has paid to keep these channels open. The proposed project would use sandy dredged material from maintenance dredging of Old House Channel to build submerged sand mounds to be topped with cultch for oyster reefs. Sand would be placed in submerged enclosures in a depth of water where optimum oyster growing conditions are found. The submerged mounds will be located near the authorized navigation channel where submerged aquatic vegetation (SAV) or other significant resources exist. Creation of the submerged sand mounds would provide an environmentally sound disposal area for dredged material. N/A Project Name Description Total Cost as of June 30, 2011 Federal State* Local Total $ - $ 2,213,698 $ - $ 2,213,698 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 35,900,000 $ 300,000 $ - Federal State Local FY 2012 $ 5,900,000 $ 100,000 $ - FY 2013 $ 10,500,000 $ - $ - FY 2014 $ 7,000,000 $ 100,000 $ - FY 2015 $ 2,500,000 $ - $ - FY 2016 $ 7,500,000 $ 100,000 $ - FY 2017 $ 2,500,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,579,000 $ 1,457,000 $ - $ 3,036,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ 87,000 $ - Construction $ 25,279,000 $ 8,656,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 400,000 $ 250,000 $ - FY 2013 $ 500,000 $ 167,000 $ - FY 2014 $ 900,000 $ 300,000 $ - FY 2015 $ 9,963,000 $ 3,321,000 $ - FY 2016 $ 3,916,000 $ 1,305,000 $ - FY 2017 $ 10,000,000 $ 3,400,000 $ - $ - *State expenditures since 2001 Status of Project MOREHEAD CITY HARBOR DREDGING, CARTERET COUNTY NEUSE RIVER BASIN INVESTIGATION Water quality and flooding problems in the Neuse River Basin have impacted the lives and livelihood of many citizens of the Neuse River Basin. This study will focus on ways to improve water quality as well as how best to improve aquatic habitats. It focuses on three areas: (1) stream and wetland restoration; (2) removal of obsolete dams and other obstructions; and (3) restoration of oyster habitat and oysters in the Neuse River estuary. Projects recommended by this study may be done as continuing authority projects by the Corps of Engineers, if funding is available, or by the State of North Carolina, if federal funding is not available. The deepening of Morehead City Harbor to 45 feet was completed in 1994. Maintenance dredging of this Harbor has been done in two ways: (1) sand from the outer ocean bar channels has been placed in either an ocean disposal site or a near shore site and (2) mostly sandy material from the inner channel and harbor area has been pumped to the Brandt Island disposal area. As the non-Federal sponsor of this project, the state is required to pay for preparation of the spoil disposal sites, which involves the raising of dikes and spillway repairs. The Corps pays for 100% of the dredging costs. FY 2017 N/A Ongoing Estimated Completion Date Status of Project 19 Feasibility scheduled for completion in FY 2012, if funding available Estimated Completion Date Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,275,820 $ 331,455 $ 306,455 $ 1,913,730 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 600,000 $ 300,000 $ 300,000 Construction O & M Federal State Local FY 2012 $ 100,000 $ 50,000 $ 50,000 FY 2013 $ 100,000 $ 50,000 $ 50,000 FY 2014 $ 100,000 $ 50,000 $ 50,000 FY 2015 $ 100,000 $ 50,000 $ 50,000 FY 2016 $ 100,000 $ 50,000 $ 50,000 FY 2017 $ 100,000 $ 50,000 $ 50,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,597,000 $ 1,400,000 $ - $ 2,997,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 303,000 $ 303,000 $ - Construction $ 13,488,000 $ 7,262,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 203,000 $ 203,000 $ - FY 2014 $ 425,000 $ 275,000 $ - FY 2015 $ 163,000 $ 87,000 $ - FY 2016 $ 13,000,000 $ 7,000,000 $ - FY 2017 $ - $ - $ - PLANNING ASSISTANCE TO NORTH CAROLINA COMMUNITIES Section 22 of the Water Resources Development Act of 1974 allows the Corps to assist states and local communities with preparation of comprehensive plans for the development, use, and conservation of water and related land resources. The non-Federal sponsor (state and/or local government) must provide 50% of the cost. For studies sponsored by units of local government, the state can provide up to 50% of the non- Federal cost. One project currently underway: Black Mountain Dam Study. One project proposal currently under consideration by the U.S. Corps of Engineers: Greenville Utilities Commission/Neuse Water and Sewer Authority Interconnection Study. N/A Status of Project FY 2016 20 Ongoing Estimated Completion Date PRINCEVILLE FLOOD CONTROL STUDY This Corps of Engineering study was funded by a special appropriation from Congress and requires that the State match these funds dollar for dollar. The purpose of the study is to determine what additional flood control measures to protect the Town of Princeville are feasible. The Corps has completed some preliminary work that indicates that the more expensive flood control measures, such as the construction of a flood bypass channel, the construction of upstream flood control dams, and the flood-proofing of existing structures are not feasible. The feasibility study is scheduled for completion in FY 2012, if funding is available. Status of Project Feasibility is scheduled for completion by end of 2012. If funds are appropriated, work on plans & specs will begin in FY 2013. Estimated Completion Date Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ - $ - $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 5,250,000 $ 250,000 $ 250,000 Federal State Local FY 2012 $ 250,000 $ - $ - FY 2013 $ 1,000,000 $ 250,000 $ 250,000 FY 2014 $ 1,000,000 $ - $ - FY 2015 $ 1,000,000 $ - $ - FY 2016 $ 1,000,000 $ - $ - FY 2017 $ 1,000,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ - $ - $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 1,500,000 $ 250,000 $ 250,000 Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ 250,000 $ 250,000 FY 2014 $ 1,500,000 $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - SILVER LAKE HARBOR MAINTENANCE DREDGING, OCRACOKE, HYDE COUNTY This project includes 12-foot deep basin within Silver Lake Harbor at Ocracoke, a 60-foot wide by 12-foot deep entrance channel from the harbor to the Teaches Hole Channel, the 150-foot wide by 12-foot deep Teaches Hole Channel to Ocracoke Inlet, and 150-foot wide by 12-foot deep Big Foot Slough Channel from the Teaches Hole Channel to Pamlico Sound. Hyde County, the local sponsor, is responsible for the costs of the sand-bag dikes used in dredging the Big Foot Slough Channel. These dikes were replaced in FY 2006 and should last until at least FY 2013 N/A Status of Project 21 Sandbag improvements scheduled for FY 2013 Estimated Completion Date STUMPY POINT BAY MAINTENANCE DREDGING, DARE COUNTY This project involves the maintenance dredging of the 3.8 mile navigation channel in Stumpy Point Bay. The channel is 10-feet deep and 75-feet wide. Material will be placed on an upland disposal site on land owned by the US Fish and Wildlife Service. Dare County is the non-federal sponsor of this project. Status of Project Dike raising in FY 2013, if funding ia available Estimated Completion Date N/A Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 2,341,000 $ 1,080,500 $ 1,080,500 $ 4,502,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 65,000 Construction $ 43,135,000 $ 8,999,667 $ 9,049,667 O & M Federal State Local FY 2012 $ 700,000 $ 116,667 $ 166,667 FY 2013 $ 300,000 $ 50,000 $ 50,000 FY 2014 $ 200,000 $ 33,000 $ 33,000 FY 2015 $ - $ - $ - FY 2016 $ 21,000,000 $ 3,200,000 $ 3,200,000 FY 2017 $ 21,000,000 $ 5,600,000 $ 5,600,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 137,000 $ - $ - $ 137,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ - $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - SURF CITY – NORTH TOPSAIL BEACH PROTECTION, PENDER COUNTY This potential hurricane protection project began in FY 2001 with a reconnaissance study funded entirely by the Corps of Engineers. That study determined that there was a Federal interest in a beach nourishment project to protect citizens of Surf City and the southern 4-mile section of North Topsail Beach from storm damages. In February 2002, the Corps entered into an agreement with the Towns of Surf City and North Topsail Beach to conduct a feasibility study funded jointly with the two towns. The feasibility study is scheduled for completion in late FY 2011 FY 2065 Status of Project 22 Fesability scheduled for completion in FY 2011. Development of plans & specs to be initiated in FY 2012, if funding available Estimated Completion Date TAR RIVER AND PAMLICO SOUND INVESTIGATION The Wilmington District, Corps of Engineers, is planning to investigate flooding, drainage, and water supply problems in the Tar – Pamlico River Basin. The Corps would then propose alternative measures to solve these problems. The State of North Carolina would be the non-Federal sponsor of this study. Because of other higher priority studies and limited manpower, the State has declined sponsorship of this study at this time. Status of Project Deferred indefinitely by the State Estimated Completion Date N/A Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 3,821,398 $ 660,366 $ 660,366 $ 5,142,130 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 27,597,000 $ 4,599,667 $ 4,599,667 O & M Federal State Local FY 2012 $ 742,000 $ 123,667 $ 123,667 FY 2013 $ - $ - $ - FY 2014 $ 26,855,000 $ 4,476,000 $ 4,476,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 242,208,000 $ 73,995,550 $ 1,345,000 $ 317,548,550 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 49,900,000 $ 16,597,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 1,900,000 $ 600,000 $ - FY 2013 $ 20,000,000 $ 6,667,000 $ - FY 2014 $ 28,000,000 $ 9,330,000 $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - WEST ONSLOW BEACH (TOPSAIL BEACH), PENDER COUNTY This authorized Corps of Engineers shore protection project for approximately 3 miles of the oceanfront at Topsail Beach on the southern end of Topsail Island was placed in the inactive category in July 1994 due to lack of local support. The town requested the Corps reevaluate the project area plus an additional 2.5 miles. The Corps of Engineers began a general reevaluation in October 2001. Cheif's report signed in September 2009. The initial plans and specs initiated in FY 2010. FY 2065 Status of Project 23 Project authorization in Water Resources Development Act in FY 2011 is next milestone Estimated Completion Date WILMINGTON HARBOR DEEPENING, NEW HANOVER and BRUNSWICK COUNTIES This project includes deepening of Wilmington Harbor, the navigation channel in the Cape Fear River from Wilmington Harbor to the Atlantic Ocean, and the Northeast Cape Fear River navigation channel. It also includes the construction of a 200-foot widening of the Cape Fear River navigation channel for a distance of 6 miles (called a passing lane) and the construction of wideners at the major turns and bends of that Cape Fear channel. The deepening will allow Wilmington Harbor to accommodate fully loaded container ships and other bulk cargo ships and keep shipping costs competitive with those at Norfolk, Charleston, and Savannah. The passing lane and wideners will allow larger ships to navigate the Cape Fear River channel in less time and greater safety. The U.S. Congress funded a new start on this combined navigation project in 1997. This project also includes the construction of a long-term disposal site for materials dredged in the vicinity of the State Port. Status of Project Dike raises at Eagle Island and installation of fish passage at Lock and Dam #1 will occur in FY 2012 Estimated Completion Date FY 2014, if funding is available. Project Name Description Total Cost as of March 31, 2010 Federal State* Local Total $ - $ 6,219,872 $ - $ 6,219,872 Estimated costs from 07/01/2010 through 06/30/2016 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 84,945,000 $ 1,200,000 $ - Federal State Local FY 2012 $ 12,445,000 $ 200,000 $ - FY 2013 $ 13,500,000 $ 200,000 $ - FY 2014 $ 14,000,000 $ 200,000 $ - FY 2015 $ 14,500,000 $ 200,000 $ - FY 2016 $ 15,000,000 $ 200,000 $ - FY 2017 $ 15,500,000 $ 200,000 $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 100,000 $ - $ - $ 100,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 5,293,000 $ 4,793,000 $ - Constuction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 93,000 $ 93,000 $ - FY 2013 $ 400,000 $ 400,000 $ - FY 2014 $ 1,600,000 $ 1,600,000 $ - FY 2015 $ 1,500,000 $ 1,500,000 $ - FY 2016 $ 1,500,000 $ 1,000,000 $ - FY 2017 $ 200,000 $ 200,000 $ - WILMINGTON HARBOR MAINTENANCE DREDGING, 42 FT. PROJECT, NEW HANOVER AND BRUNSWICK COUNTIES Maintenance dredging is required almost every year to keep open the channels from the Atlantic Ocean up the Cape Fear and Northeast Cape Fear rivers to Wilmington, Fayetteville, and other terminal points. The Federal government pays for the cost of dredging the sediments, while the state of North Carolina, the non- Federal sponsor, pays for the cost of dredged material disposal areas. Without this maintenance work, the exporting and importing of goods and commodities through the State Ports Authority terminal and numerous private terminals could not occur. The beach quality sand that is dredged from the navigation channel from the Atlantic Ocean to Wilmington is placed on the following beaches: Carolina Beach, Bald Head Island, Caswell Beach, and Oak Island. N/A Status of Project 24 Ongoing Estimated Completion Date *State expenditures since 2001 WILMINGTON HARBOR IMPROVEMENTS FEASIBILITY STUDY, NC This is a proposed cost-shared U.S. Army Corps of Engineers feasibility study which would investigate issues related to traffic delays and safety concerns caused by the existing Wilmington Harbor channel alignment. Areas to be investigated include the entrance channel, navigation channel adjacent to Bald Head Island and the Battery Island turn, and the safe and efficient turning of containerships in the existing Anchorage Basin, The study would seek to identify options for improving access to the State Ports Authority terminal and other private terminals in the Wilmington Harbor complex and improve safety for ships visiting the harbor. The safe and efficient operation of the Wilmington Harbor complex is vital to the economy of the local area and the entire State. Status of Project Recon study completed Estimated Completion Date FY 2016 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ 300,000 $ 150,000 $ 150,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 961,000 $ 240,000 $ 240,000 $ 1,441,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 2,909,000 $ 777,000 $ 777,000 O & M $ - $ - $ - Federal State Local FY 2012 $ 2,491,000 $ 105,000 $ 105,000 FY 2013 $ 270,000 $ 633,000 $ 633,000 FY 2014 $ 50,000 $ 14,000 $ 14,000 FY 2015 $ 50,000 $ 14,000 $ 14,000 FY 2016 $ 48,000 $ 11,000 $ 11,000 FY 2017 $ - $ - $ - 25 WILSON BAY RESTORATION (SECTION 206) , ONSLOW COUNTY Wilson Bay is a 106-acre shallow estuarine embayment of the New River within the City of Jacksonville. The Wilson Bay aquatic ecosystem was degraded by many years of wastewater from a sewage treatment plant and by urban non-point source runoff. This restoration project’s goals are to improve water quality, restore the benthic community and the use of the Bay as a nursery area, and restore the use of the Bay for recreation and economic purposes. The City of Jacksonville has already taken several major actions to rehabilitate the Bay including the decommissioning of the wastewater treatment plant, installing three water column aeration units, planting oysters in the bay, and planting wetlands along the shoreline. The Corps has designed a project to help the City’s project become self-sustaining. It will purchase and operate three additional aerators, restore wetlands and creeks within the Wilson Bay urban watershed, plant additional oysters and submerged aquatic vegetation, and install bio-swales and rain gardens. The City of Jacksonville is the non-federal sponsor of the project. Status of Project Project in design stage and scheduled for award in FY 2011 Estimated Completion Date FY 2017 WILMINGTON HARBOR INPROVEMENTS, SECTION 216 This proposed study will review the Wilmington Harbor navigation project from the Horseshoe Shoal area through the inner ocean bar channel, located on the southeastern coast of North Carolina in Brunswick and New Hanover Counties. The existing project provides for a channel 44 feet deep through the ocean bar and entrance channel changing to 42 feet deep extending to the upper portion of the anchorage basin at the state of North Carolina ports facility at Wilmington, NC. This study will review the completed project and determine if modifications are advisable due to significantly changed physical, environmental, and/or economic conditions. Alternatives to be investigated could include leaving the channel in their current status or modifying channel depths and/or alignment through partial or total removal. Status of Project Awaiting federal funding Estimated Completion Date Unknown at this time Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 11,914,000 $ 4,287,308 $ 1,721,308 $ 17,922,616 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 4,200,000 $ 942,000 $ 942,000 O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 350,000 $ - $ - FY 2014 $ 3,500,000 $ 942,000 $ 942,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ 350,000 $ - $ - Next renourishment scheduled for FY 20 14 Estimated Completion Date FY 2036 26 WRIGHTSVILLE BEACH RENOURISHMENT, NEW HANOVER COUNTY This Corps of Engineers project is located at Wrightsville Beach, a barrier island about 5 miles east of Wilmington. The project provides both beach erosion and hurricane protection. It consists of a frontal dune at elevation 15-feet above mean low water and a beach berm at elevation 12-feet. The project was built to protect against hurricanes equal to that of October 15, 1954 (Hurricane Hazel). The Water Resources Development Act of 1986 provides for Federal participation in the renourishment of the project over its 50-year lifetime, until 2036. Renourishment normally occurs every four years. Status of Project Federal State Local 204 Brandt Island, NC Beneficial use of dredged material $ 3,140,000 $ 1,610,000 TBD 204 Manteo Old House Channel, Dare County * Oyster reef creation from dredge spoils $ 2,728,000 $ 1,173,000 TBD 206 Gum Thicket Creek Restoration, Oriental, Pamlico County Marsh creation, Shoreline stabilization $ 1,485,000 $ 915,000 TBD 206 NC Oyster Habitat Restoration Oyster habitat restoration $ 1,305,000 $ 695,000 TBD 206 Gooch's Mill Dam Removal, Granville Co, NC Dam removal to restore fish migration $ 573,000 $ 278,000 TBD 206 Monkey Island Restoration, NC Habitat creation, shoreline stabilization $ 885,000 $ 455,000 TBD 206 NC Fish Passage and Dam Removals, NC Dam removals to restore fish migration $ 2,575,000 $ 1,425,000 TBD 206 Northern Currituck Sound SAV and Marsh Restoration, NC Habitat restoration $ 1,825,000 $ 975,000 TBD 206 Southern Currituck Sound SAV and Marsh Restoration, NC Habitat restoration $ 1,825,000 $ 975,000 TBD 1135 Belhaven Harbor Environmental Improvements, NC * Habitat creation $ 2,300,000 $ 837,000 $ 407,000 Federal State Local 9 AIWW - Snows Cut, New Hanover County Salt water intrusion to Cape Fear River estuary $ 1,600,000 $ 750,000 $ 750,000 13 Cape Fear Above Wilmington, NC Deauthorization of L&D 1,2 & 3 $ 1,600,000 $ 750,000 $ 750,000 14 Carolina Beach, NC Reuthorization of beach renourishment project $ 1,100,000 $ 500,000 $ 500,000 25 Wilmington Harbor, NC Channel performance evaluation $ 1,600,000 $ 750,000 $ 750,000 Proposed projects in USACE-Wilmington District A. Continuing Authorities Programs Projects that are funded through the Continuing Authorities Program include: Section 204 (Beneficial use of dredged material), Section 206 (Restoration of aquatic ecosystems), and Section 1135 (Modifications to Corps projects for the Improvement of the Environment). These three sections have been authorized by the U.S. Congress and are annually funded by section. Projects that are "named" by the U.S. Congress receive priority for funding within that section. The Corps allocates funding to named projects first before unnamed projects. B. General Investigations Project Name Type Estimated Cost Estimated Cost Section Section 216 grants the Corps the authority to reevaluate existing Corps projects. The Corps can conduct reconnaissance and feasibility studies under Sec. 216, but authorization from the U.S. Congress is required for any construction activities. 27 Page Project Name Study Subject * Federal funds have been allocated for these two projects. Project have not been initiated, details can be found on pages 11 (Belhaven) and 18 (Manteo) 28 ( This Page Intentionally Left Blank ) 29 B. Project Information, Category 3, Water Resources Development Projects for Which Grant Applications Have Been Submitted Under Part 8 of Article 21 of Chapter 143 of the General Statutes Project application status is as of June 1, 2011 and subject to change if any additional submittals are made prior to July 1, 2011 grant application deadline. Project Name Page No. Aquatic Weed Control – Lake Gaston 31 Aquatic Weed Control – Statewide 31 Aquatic Weed Control Equipment Storage Facility 31 Asheville Stormwater Study 32 Avery County High School Stormwater Wetland 32 Bald Creek Restoration (SS) 32 Banner Elk Elementary School SW Wetland & Stream Restoration 32 Bear Creek DD #1 Water Management 33 Beaufort Regional Health Water Management 33 Big Creek Restoration Phase 2 (PS) 33 Big Hungry River Dam Removal Phase 2 33 Boone Fork and Watauga River Restoration (HS) 34 Bowlin-Peak Creek Stream Restoration 34 Calico Bay Drainage 34 Calypso Drainage Project 34 Carolina Beach Access Phase 3 35 Catawba Water Management Study 35 Chicod Creek Snagging 35 Cold Water Creek Restoration 35 Colington Harbor Entrance Channel Phase 7 36 Connestee Falls Park 36 Contentnea Creek Water Management 36 County-wide NPS GIS Evaluation 36 Coweeta Creek Restoration (CS) 37 Cub Creek Park Bioretention Project 37 Dogwood Park Phase 2 37 East Sugarloaf Island Groin 37 Elm Grove Water Management 38 French Broad River Restoration (GAES) 38 French Broad River Restoration (PS) 38 Goshen Swamp Water Management 38 Greenevers Water Management 39 Indian Grave Creek Restoration 39 Irish Creek Restoration (SS) 39 Island Creek (and tributaries) Water Management 39 Little Fisher River Restoration 40 Little Fork Creek Restoration 40 Livingston Creek Water Management 40 Lumber River Snagging Phase 4 40 Mars Hills Elementary Water Management 41 Mill Branch Drainage 41 30 Mitchell River Restoration 41 Mitchell River Wetland Restoration 41 MST Park (FS and Land Acquisition) Phase 2 42 Nags Head Beach Protection 42 Obids Creek Restoration 42 Ocean Isle Beach Stormwater 42 Pine Level Drainage 43 Polk County Courthouse Water Management 43 Riverview Acres Navigation Phase 2 43 Roscoe Creek Drainage 43 Saddle Mountain Creek Restoration 44 Shoal Creek Restoration (MS) 44 Shuford Mills (Brookford) Dam removal project. 44 Sills Creek Drainage 44 Skewarkee Trail Stormwater Management 45 South Hominy Creek Restoration (IS) 45 Southern H.S. Water Mgmt. Design Phase 2 45 Southern Shores Dredging Phase 3 45 Stewarts Creek Restoration 46 Stewarts Creek Water Management 46 Trent River Navigation Phase 3 46 Tuckerhole Creek Stream Restoration 46 UT Kings Creek Restoration (LS) 47 Vance Dam Removal and Rose Ck. Stabilization 47 Wallace Storm Drainage Phase 2 47 Walnut Street Culvert Water Management 47 Wendell Stormwater Study - Lake Dr. Catchment 48 West Montgomery High Water Management 48 West Pine Swamp Creek Restoration 48 Western NC Nature Center Water Management 48 White Oak Branch Drainage 49 Woodfin Greenway Trail & Stream Enhancement 49 Zack Circle Stormwater 49 Project Name Description State Local Total State Total $ 100,000 $ 100,000 $ 200,000 $ 2,134,375 $ 4,053,525 Project Name Description State Local Total State Total $ 200,000 $ 200,000 $ 400,000 $ 1,534,559 $ 2,805,695 Project Name Description State Local Total State Total $ 267,000 $ 267,000 $ - 31 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Project involves the construction of a pre-engineered building (120’ x 32’) for housing equipment associated with the N.C. Division of Water Resources Aquatic Weed Control Program. The facility would be located in Raleigh, on land leased from North Carolina State University. The N.C. Division of Water Resources provides technical assistance to local governments and public utilities in the management of noxious aquatic weed infestations. This assistance involves the use of an assortment of specialized equipment which is required to conduct the field work. The types of equipment include: Truck, boats (3 airboats, 2 jonboats), canoes, small gas-powered engines, sprayers, spreaders, power cutters, hand tools, etc. This equipment is currently stored at a temporary location pending the construction of a proper facility. The new facility would allow for centralized long-term storage and a base for field operations. The facility would provide a safe place to service and repair equipment and protect sensitive and AQUATIC WEED CONTROL EQUIPMENT STORAGE FACILITY Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 specialized equipment from the weather. The facility would also provide a secure room for the herbicides and related chemicals used by the program. N.C. State University has agreed to prepare a site and provide utilities in exchange for shared space in the new facility. The NCSU has an aquatic weed research program that is part of the Crop Science division. They are interested in consolidating their operations into one location. The needs of the two programs (DWR and NCSU) align and the partnership will provide mutual benefits In 1985, a survey of Lake Gaston found 15 acres infested with the aquatic weed Hydrilla. By the fall of 1996, the infestation had grown to over 3,250 acres. The total area of Lake Gaston that can potentially be impacted is about 5,000 acres, or all of the lake that is less than 10 feet deep. Hydrilla interferes with fishing, boating, swimming, and water skiing. The Division of Water Resources has assisted the Lake Gaston Weed Control Council in chemical and biological treatments since 1994. In 2010, approximately 802 acres of weed infested waters were treated using herbicides, and an additional 367 acres were targeted with biological agents AQUATIC WEED CONTROL – LAKE GASTON $ 1,919,150 Status of Project Local Est. Completion Date G.S. 143-215.71 AQUATIC WEED CONTROL - STATEWIDE The N.C. Div. of Water Resources provides technical and financial assistance to local governments in the evaluation and treatment of aquatic weed infestations. State financial assistance (50% cost-sharing) for local weed control projects is still available. During the 2010 treatment season, DWR worked with local government and utility sponsors in the treatment of approximately 1405 acres of weed infested waters using herbicides, and an additional 730 acres were targeted with biological agents (Treatment numbers include Lake Gaston). In 2011 a similar number of projects and scope is expected. The estimated total cost to provide this service is $200,000 State Funding Source Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local G.S. 143-215.71 N/A Ongoing Ongoing Awaiting State funding Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ 1,271,136 State Funding Source Project Name Project Sponsor County Description State Local Total State Total $ 24,000 $ 24,000 $ 48,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 175,000 $ 175,000 $ 350,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 69,794 $ 69,794 $ 139,588 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 228,636 $ 228,636 $ 457,271 $ - $ - 32 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 1,260 feet of eroding streambank along Bald Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This study will develop stormwater best management practice (BMPs) guidelines for the urbanized Asheville area. $ - State Funding Source G.S. 143-215.71 Deferred Asheville Stormwater Study City of Asheville Buncombe This project will treat stormwater runoff diverted from a 15-acre urban catchment before it enters Kentucky Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Avery Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will construct a one-acre stormwater wetland, a one-acre riparian wetland and restore 600 feet of eroding streambank. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Avery County High School Stormwater Wetland Avery County School Board Avery Bald Creek Restoration (SS) Haywood Soil and Water Haywood Banner Elk Elementary School SW Wetland & Stream Restoration Town of Banner Elk Project Name Project Sponsor County Description State Local Total State Total $ 24,975 $ 24,975 $ 49,950 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 197,498 $ 197,498 $ 394,996 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 10,000 $ 10,000 $ 20,000 $ 110,000 $ 165,000 Project Name Project Sponsor County Description State Local Total State Total $ 99,500 $ 99,500 $ 199,000 $ - $ - 33 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This feasibility study will provide engineering design and permitting for restoring a 4,000-foot reach of streambank along Big Creek. Status of Project Local $ 55,000 Deferred This project will make repairs at four dam water control structures. $ - State Funding Source G.S. 143-215.71 Deferred Bear Creek DD #1 Water Management Wayne County Drainage District # Wayne This project will redesign and enlarge an existing stormwater retention pond to increase capacity and improve treatment of stormwater runoff. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Henderson Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will assist the NC Wildlife Resources Commission in the removal of the Big Hungry Dam which impedes movement of aquatic organisms. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Beaufort Regional Health Water Management Beaufort Regional Health System Beaufort Big Creek Restoration Phase 2 (PS) Surry Soil and Water Surry Big Hungry River Dam Removal Phase 2 Wildlife Resources Commission Project Name Project Sponsor County Description State Local Total State Total $ 116,567 $ 116,567 $ 233,133 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 33,750 $ 33,750 $ 67,500 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 284,858 $ 284,858 $ 569,715 $ - $ - 34 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This proposed project will develop a basin wide Water Supply Master Plan for the Catawba Basin. The project will better equip the Catawba Wateree Water Management Group to comprehensively address all water related issues in the CW Basin, in support of its overall mission. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will stabilize 1,500 feet of eroding streambank along Boone Fork and the Watauga River. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Boone Fork and Watauga River Restoration (HS) Watauga County Watauga This project will stabilize 1,180 feet of eroding streambank along Peak Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will replace drainage infrastructure in three watersheds located within the Town of Calypso. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Bowlin-Peak Creek Stream Restoration New River Soil and Water Ashe Calico Bay Drainage Pender County Pender Calypso Drainage Project Town of Calypso Project Name Project Sponsor County Description State Local Total State Total $ 70,616 $ 70,616 $ 141,232 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 37,500 $ 37,500 $ 75,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 14,546 $ 14,546 $ 29,091 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,870 $ 56,870 $ 113,741 $ - $ - 35 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 5 mile reach of upper Chicod Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project involves the purchase of a 0.287 acre parcel which will become part of the Ocean-to-Sound Access Park and future home of the NC Aquarium Pier. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Carolina Beach Access Phase 3 Town of Carolina Beach New Hanover This project will update the Catawba Wateree water Supply Study that was originally conducted in 2006 as part of Duke Energy's hydro relicensing effort. The update is required every 10 years in the settlement Agreement that was negotiated between S.C. and N.C. in order to resolve the Supreme Court lawsuit that was initiated by S.C. over the equitable use of the Catawba Wateree water. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Cabarrus Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 1,300 feet of eroding streambank along Cold Water Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Catawba Water Management Study Catawba Wateree Water Managem Mecklenburg Chicod Creek Snagging Pitt County Pitt Cold Water Creek Restoration Cabarrus Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 15,675 $ 15,675 $ 31,350 $ 94,933 $ 118,666 Project Name Project Sponsor County Description State Local Total State Total $ 166,500 $ 166,500 $ 333,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 69,260 $ 69,260 $ 138,520 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 23,035 $ 23,035 $ 46,070 $ - $ - 36 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 20 mile reach of Contentnea Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This is Phase 7 of an ongoing dredging project to maintain the navigation channel at the entrance to Colington Harbor. $ 23,733 State Funding Source G.S. 143-215.71 Deferred Colington Harbor Entrance Channel Phase 7 Dare County Dare This project will upgrade recreation amenities at Connestee Falls Park. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Madison Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will perform a preliminary GIS evaluation of pollutant sources in Madison County with follow-up field observations. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Connestee Falls Park Transylvania County Transylvania Contentnea Creek Water Management Greene County Greene County-wide NPS GIS Evaluation Madison Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 25,345 $ 25,345 $ 50,690 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 40,000 $ 40,000 $ 80,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 127,433 $ 127,433 $ 254,866 $ 86,060 $ 172,120 Project Name Project Sponsor County Description State Local Total State Total $ 206,500 $ 206,500 $ 413,000 $ - $ - 37 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will construct water-based recreation amenities at Dogwood Park. Status of Project Local $ 86,060 Water Resources Development Grant Application under consideration for funding This project will stabilize 250 feet of eroding streambank along Coweeta Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Coweeta Creek Restoration (CS) Macon Soil and Water Macon This project will treat stormwater runoff diverted from a 22-acre urban catchment before it enters Cub Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Carteret Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will construct a groin on the east end of Sugarloaf Island to abate sand migration into the Morehead City Bulkhead Navigation Channel. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Cub Creek Park Bioretention Project Town of Wilkesboro Wilkes Dogwood Park Phase 2 Village of Wesley Chapel Union East Sugarloaf Island Groin Town of Morehead City Project Name Project Sponsor County Description State Local Total State Total $ 24,663 $ 24,663 $ 49,325 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 28,395 $ 28,395 $ 56,790 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 89,728 $ 89,728 $ 179,456 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 198,283 $ 198,283 $ 396,567 $ - $ - 38 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 1,027 feet of eroding streambank along the French Broad River. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will dip out and redesign 4,200 feet of open drainage channel and replace culverts at two private road crossings. $ - State Funding Source G.S. 143-215.71 Deferred Elm Grove Water Management Bertie County Bertie This project will stabilize 325 feet of eroding streambank along the French Broad River. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 25.3 mile reach of Goshen Swamp. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A French Broad River Restoration (GAES) Transylvania Soil and Water Transylvania French Broad River Restoration (PS) Transylvania Soil and Water Transylvania Goshen Swamp Water Management Duplin Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 21,655 $ 21,655 $ 43,310 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 124,250 $ 124,250 $ 248,501 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 17,504 $ 17,504 $ 35,007 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 127,741 $ 127,741 $ 255,483 $ - $ - 39 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 374 feet of eroding streambank along Irish Creek. Status of Project Local $ - Deferred This project will perform 29,144 feet of roadside ditch maintenance within the Town of Greenevers. $ - State Funding Source G.S. 143-215.71 Deferred Greenevers Water Management Town of Greenevers Duplin This project will stabilize 1,500 feet of eroding streambank along Indian Grave Creek using gabion baskets. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 16.3 mile reach of Island Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Indian Grave Creek Restoration Town of Kenansville Duplin Irish Creek Restoration (SS) Burke Soil and Water Burke Island Creek (and tributaries) Water Management Duplin County Project Name Project Sponsor County Description State Local Total State Total $ 112,444 $ 112,444 $ 224,888 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 318,591 $ 318,591 $ 637,181 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 90,874 $ 90,874 $ 181,748 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 62,500 $ 62,500 $ 125,000 $ 293,200 $ 366,500 40 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 8.1 mile reach of Livingston Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will stabilize 2,400 feet of eroding streambank along the Little Fisher River. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Little Fisher River Restoration Surry Soil and Water Surry This project will stabilize 5,000 feet of eroding streambank along the Little Fork Creek within the Rendezvous Mountain Educational State Forest. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Robeson Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ 73,300 Status of Project Est. Completion Date This project will remove small boat navigation hazards from a 64 mile reach of the Lumber River. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Little Fork Creek Restoration State (Division of Forest Resourc Wilkes Livingston Creek Water Management Columbus County Columbus Lumber River Snagging Phase 4 Lumber River COG Project Name Project Sponsor County Description State Local Total State Total $ 21,990 $ 21,990 $ 43,981 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 37,481 $ 37,481 $ 74,963 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,222 $ 56,222 $ 112,444 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,222 $ 56,222 $ 112,444 $ - $ - 41 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 4,400 feet of eroding streambank along the Mitchell River. Status of Project Local $ - Deferred This project will install and evaluate the effectiveness of a mycofiltration water quality improvement technique at two locations. $ - State Funding Source G.S. 143-215.71 Deferred Mars Hills Elementary (mycofiltration) Water Management (Prior funding) Madison Soil and Water Madison This project will remove flow blockages from a 2.2 mile reach of Mill Branch. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Surry Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 3,550 feet of eroding streambank along the Mitchell River and an unnamed tributary. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Mill Branch Drainage Pender County Pender Mitchell River Restoration Surry Soil and Water Surry Mitchell River Wetland Restoration Surry Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 192,500 $ 192,500 $ 385,000 $ 96,000 $ 192,000 Project Name Project Sponsor County Description State Local Total State Total $ 10,964,167 $ 22,260,581 $ 33,224,748 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 239,880 $ 239,880 $ 479,760 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 95,424 $ 95,424 $ 190,847 $ - $ - 42 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 2,500 feet of eroding streambank along Obids Creek and an unnamed tributary. Status of Project Local $ - Deferred This project involves the purchase of 11 properties having a total area of 37 acres for the Mountains to Sea Trail corridor along the Neuse River. $ 96,000 State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding MST Park (FS and Land Acquisition) Phase 2 Town of Clayton Johnston This project will renourish 10 miles of beach by hydraulic dredge using 4.6 million cubic yards of beach-quality sand located in offshore ocean borrow areas. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Brunswick Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will collect and treat stormwater runoff along 4,520 linear feet of roadway within the community. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Nags Head Beach Protection Town of Nags Head Dare Obids Creek Restoration New River Soil and Water Ashe Ocean Isle Beach Stormwater Town of Ocean Isle Beach Project Name Project Sponsor County Description State Local Total State Total $ 133,433 $ 133,433 $ 266,867 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 138,681 $ 138,681 $ 277,361 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 228,450 $ 228,450 $ 456,900 $ 39,400 $ 49,250 Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - 43 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This is Phase 2 of a dredging project to improve navigation within the Riverview Acres subdivision located on the Pasquotank River. Status of Project Local $ 9,850 Water Resources Development Grant Application under consideration for funding This project will upgrade the stormwater drainage infrastructure at three locations within the Town of Pine Level. $ - State Funding Source G.S. 143-215.71 Deferred Pine Level Drainage Town of Pine Level Johnston This project will utilize three innovative approaches to control stormwater runoff and improve runoff water quality within the Courthouse Square area in the Town of Columbus. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Pender Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 2.2 mile reach of Roscoe Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Polk County Courthouse Water Management Town of Columbus Polk Riverview Acres Navigation Phase 2 Pasquotank County Pasquotank Roscoe Creek Drainage Pender County Project Name Project Sponsor County Description State Local Total State Total $ 22,489 $ 22,489 $ 44,978 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 39,730 $ 39,730 $ 79,460 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 97,500 $ 97,500 $ 195,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 112,444 $ 112,444 $ 224,888 $ - $ - 44 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will complete the design, permitting requirements and removal of the Shuford Mills Dam located on the Henry Fork River in Catawba County near the community of Brookford. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will replace the culvert underneath Reynolds Road that is a fish barrier in Saddle Mountain Creek; which is designated as an Outstanding Resource Water by the NC Wildlife Resources Commission. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Saddle Mountain Creek Restoration Surry Soil and Water Surry This project will stabilize 875 feet of eroding streambank along Shoal Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Pender Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 2.5 mile reach of Sills Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Shoal Creek Restoration (MS) Yancey Soil and Water Yancey Shuford Mills (Brookford) Dam removal project. Catawba Soil and Water Catawba Sills Creek Drainage Pender County Project Name Project Sponsor County Description State Local Total State Total $ 17,347 $ 17,347 $ 34,693 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 109,328 $ 109,328 $ 218,657 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 90,000 $ 90,000 $ 180,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 250,000 $ 250,000 $ 500,000 $ 848,000 $ 1,292,894 45 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will design a retrofit for stormwater conveyance from roofs, parking lots and other impervious areas on the school grounds to bioretention ponds, stormwater treatment wetlands, underground cisterns and rain gardens. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will install BMPs to reduce erosion along a section of the Town's stormwater management system. $ - State Funding Source G.S. 143-215.71 Deferred Skewarkee Trail Stormwater Management Town of Williamston Martin This project will stabilize 1,265 feet of eroding streambank along South Hominy Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Dare Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ 444,894 Status of Project Est. Completion Date This project will maintenance dredge 7 miles of canal within Southern Shores and the channel connecting the canal system to Currituck Sound. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A South Hominy Creek Restoration (IS) Buncombe Soil and Water Buncombe Southern High School Water Management Design Phase 2 Durham Soil and Water Durham Southern Shores Dredging Phase 3 Town of Southern Shores Project Name Project Sponsor County Description State Local Total State Total $ 137,500 $ 137,500 $ 275,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 68,181 $ 68,181 $ 136,361 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 31,250 $ 31,250 $ 62,500 $ 173,840 $ 217,300 Project Name Project Sponsor County Description State Local Total State Total $ 240,630 $ 240,630 $ 481,259 $ - $ - 46 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove small boat navigation hazards from an 8 mile reach of the Trent River. Status of Project Local $ 43,460 Deferred This project will stabilize feet of eroding streambank along Stewarts Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Stewarts Creek Restoration Surry Soil and Water Surry This project will remove flow blockages from an 8.7 mile reach of Stewarts Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Wilkes Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 1,500 feet of eroding streambank along Tuckerhole Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Stewarts Creek Water Management Duplin County Duplin Trent River Navigation Phase 3 Jones County Jones Tuckerhole Creek Stream Restoration Town of Wilkesboro Project Name Project Sponsor County Description State Local Total State Total $ 44,978 $ 44,978 $ 89,955 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 148,754 $ 148,754 $ 297,508 $ 145,504 $ 217,074 Project Name Project Sponsor County Description State Local Total State Total $ 62,462 $ 62,462 $ 124,924 $ - $ - Vance Dam Removal and Rose Creek Stabilization Mitchell Soil and Water Mitchell Wallace Storm Drainage Phase 2 Town of Wallace Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Robeson 47 Deferred N/A Walnut Street Culvert Water Management Status of Project Est. Completion Date This project will replace a box culvert underneath North Walnut Street and relocated utilities required to accommodate the replacement. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Deferred City of Lumberton N/A Local $ - UT Kings Creek Restoration (LS) Caldwell Soil and Water Caldwell This project will remove an earthen dam located on Rose Creek and restore 900 feet of stream channel. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local $ 71,570 Water Resources Development Grant Application under consideration for funding This project will stabilize 600 feet of eroding streambank along an unnamed tributary to Kings Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding State Funding Source G.S. 143-215.71 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date This project will upgrade drainage infrastructure along four streets within the Town of Wallace. Status of Project Local Project Name Project Sponsor County Description State Local Total State Total $ 5,375 $ 5,375 $ 10,750 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 78,025 $ 78,025 $ 156,051 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 137,931 $ 137,931 $ 275,862 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 86,807 $ 86,807 $ 173,613 $ - $ - 48 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 900 feet of eroding streambank along West Pine Swamp Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This feasibility study will analyze the hydraulic capacities and identify deficiencies of the existing stormwater collection system serving the Lake Drive area of Wendell. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Wendell Stormwater Study - Lake Drive Catchment Town of Wendell Wake This project will install a drainage system for athletic fields at West Montgomery High School. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Buncombe Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will utilize four innovative approaches to control stormwater runoff and improve runoff water quality at the Western NC Nature Center. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A West Montgomery High Water Management Montgomery County Board of Ed Montgomery West Pine Swamp Creek Restoration New River Soil and Water Ashe Western NC Nature Center Water Management City of Asheville Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 360,170 $ 360,170 $ 720,340 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 80,500 $ 80,500 $ 161,000 $ - $ - Woodfin Greenway Trail and Stream Enhancement Town of Woodfin Buncombe Zack Circle Stormwater City of Jacksonville Onslow Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local 49 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Deferred N/A $ - White Oak Branch Drainage Pender County Pender This project will construct a 5,000-foot section of greenway along Beaver Dam Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local $ - Deferred This project will remove flow blockages from a 3.5 mile reach of White Oak Branch. $ - State Funding Source G.S. 143-215.71 Deferred State Funding Source G.S. 143-215.71 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date This project will upgrade stormwater drainage infrastructure at a site located on Zack Circle in the City of Jacksonville. Status of Project Local 50 ( This Page Intentionally Left Blank ) 51 C. Project Information, Category 4, Water Resources Development Projects for which grant applications have been submitted under Article 4 of Chapter 139 of the General Statutes. None at this time D. Project Information, Category 5, Water Resources Development Projects planned as federal reservoir projects but for which no federal funds are scheduled and for which Local Governments are seeking financial assistance. None at this time 52 APPENDIX Part 8A. Water Resources Development Plan. § 143-215.73A. Water Resources Development Plan. (a) Plan prepared. – Before 1 July in each calendar year, the Department of Environment and Natural Resources shall prepare a statewide plan for water resources development projects for a period of six years into the future. The plan shall be known as the Water Resources Development Plan. If the plan differs from the Water Resources Development Plan adopted for the preceding calendar year, the Department shall indicate the changes and the reasons for such changes. The Department shall submit the plan to the Director of the Budget for review. (b) Projects listed. – The plan shall list the following water resources development projects based on their status as of 1 May of the year in which the plan is prepared: (1) Projects approved by the Congress of the United States. (2) Projects for which the Congress of the United States has appropriated funds. (3) Projects for which grant applications have been submitted under Part 8 of Article 21 of Chapter 143 of the General Statutes. (4) Projects for which grant applications have been submitted under Article 4 of Chapter 139 of the General Statutes. (5) Projects planned as federal reservoir projects but for which no federal funds are scheduled and for which local governments are seeking State financial assistance. (c) Project priorities and funding recommendations. – The Department shall assign a priority to each project within each of the five categories listed under subsection (b) of this section either by giving the project a number, with "1" assigned to the highest priority, or by recommending no funding. The Department shall state its reasons for recommending the funding, deferral, or elimination of a project. The Department shall determine the priority of a project based on the following criteria: local interest in the project, the cost of the project to the State, the benefit of the project to the State, and the environmental impact of the project. (d) Project information. – For each project listed under subsection (b) of this section, the Water Resources Development Plan shall: (1) Provide a brief description. (2) If federal, list the estimated cost of each of the following phases that have not been completed as of 1 July, (i) feasibility study, (ii) construction, (iii) operation and maintenance, and the amount of State funds required to match the federal funds needed. (3) If State or local, list the estimated cost to complete the project and amount of State funds required under G.S. 143- 215.71 or G.S. 139-54. (4) Indicate the total cost to date and the State share of that cost. (5) Indicate the status. (6) Indicate the estimated completion date. (e) Distribution of the plan. – The Director of the Budget shall provide copies of the plan to the members of the Advisory Budget Commission when the Advisory Budget Commission meets to deliberate on the biennial budget or on the revised budget for the second year of the biennium. The Director of the Budget shall also provide copies of the plan to the General Assembly along with the recommended biennial budget and the recommended revised budget for the second year of the biennium. (f) Budget recommendations. – The Director of the Budget shall determine which projects, if any, will be included in the recommended biennial budget and in the recommended revised budget for the second year of the biennium. The budget document transmitted to the General Assembly shall identify the projects or types of projects recommended for funding. (1991, c. 181, s. 1; 1997-443, s. 11A.119(a).)
Object Description
Description
Title | Water resources development plan |
Date | 2011-07-01 |
Description | 2012/2017 |
Digital Characteristics-A | 176 KB; 56 p. |
Digital Format | application/pdf |
Full Text | North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources Development Plan Fiscal Years 2012-2017 July 1, 2011 Water Resources Development Plan Fiscal Years 2012 – 2017 Table of Contents Page No. Executive Summary .................................................................................................................................................................... i Federal Budget Information........................................................................................................................................................ ii I. Introduction ................................................................................................................................................................. 1 A. Authority and Purpose of Plan ................................................................................................................... 1 B. Organization and Project Categories ......................................................................................................... 1 C. Distribution of Plan ..................................................................................................................................... 1 D. Budget Recommendations ......................................................................................................................... 1 II. Project Lists A. Categories 1 and 2 ...................................................................................................................................... 2 B. Category 3.................................................................................................................................................... 3 C. Category 4.................................................................................................................................................... 5 D. Category 5.................................................................................................................................................... 5 III. Priorities A. Categories 1 and 2 ...................................................................................................................................... 5 B. Category 3.................................................................................................................................................... 5 C. Category 4.................................................................................................................................................... 6 D. Category 5.................................................................................................................................................... 6 IV. Project Information .................................................................................................................................................... 7 A. Categories 1 and 2 ...................................................................................................................................... 9 B. Category 3.................................................................................................................................................... 31 C. Category 4.................................................................................................................................................... 51 D. Category 5.................................................................................................................................................... 51 Appendix – G.S. 143-215.73A ..................................................................................................................................................... 52 ( This Page Intentionally Left Blank ) 1 WATER RESOURCES DEVELOPMENT PLAN I. Introduction A. Authority and Purpose of Plan General Statute 143-215.73A requires the Department of Environment and Natural Resources to prepare a statewide plan for water resources development projects. The plan lists projects proposed for a six-year period and is due by July 1 each year. The purpose of the plan is to give the Governor and the State Budget Director a long-range forecast of state funding needs for water resources development. The Governor can then use the plan to select and recommend projects for funding in the biennial budget. The plan also gives the members of the Advisory Budget Commission and the General Assembly a long-range forecast of state funding requirements for water resources development projects. The plan will provide them with information to use in their consideration of the Governor’s funding recommendations. B. Organization and Project Categories The plan has been written in three parts: 1) Project Listings; 2) Project Priorities and Funding Recommendations; and 3) Project Information. The first part contains a listing of all projects grouped under the five categories specified in part (b) of G.S. 143-215.73A. The second part shows the priority assigned to each project and whether or not it is recommended for funding, for deferral, or for elimination. The final section contains specific information on each project as required under G.S. 143-215.73A(d). C. Distribution of the Plan The Department of Environment and Natural Resources submits the plan to the Governor each year by July 1. The Governor also provides copies of the plan to the General Assembly along with her recommended biennial budget or her recommended revised budget for the second year of the biennium. D. Budget Recommendations This report includes the recommendations of the Department of Environment and Natural Resources as to which projects should be funded in the next biennial budget or in the revised budget for the second year of the biennium. The Governor chooses which of these projects, if any, will be included in her recommended biennial budget (or in the revised budget for the second year of the biennium). The budget document transmitted to the General Assembly by the Governor identifies the water resources development projects recommended for funding. 2 II. Project Lists A. Category 1 and Category 2: Water Resources Development Projects Approved by Congress and Projects for Which Congress has Appropriated Funds Investigations Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding AIWW, Snows Cut, NC (Section 216) Yes No Bald Head Island, NC Yes No Bogue Banks, NC Yes Yes Cape Fear River, NC above Wilmington (Sec 216) Yes No Carolina Beach (Sec 216) (Carolina Beach Portion) Yes No Currituck Sound, NC Yes Yes John H. Kerr Dam and Reservoir, VA & NC (Sec 216) Yes Yes Neuse River Basin, NC (PED) Yes Yes Princeville, NC Yes Yes Surf City and North Topsail Beach, NC Yes Yes Tar River and Pamlico Sound, NC Yes Yes Wilmington Harbor (Section 216) Yes No Wilmington Harbor Improvements Feasibility Yes Yes Construction Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding Brunswick Co. Beaches (Ocean Isle), NC Yes Yes Brunswick Co. Beaches GRR (Oak Island / Caswell / Holden), NC Yes Yes Carolina Beach and Vicinity, NC (Carolina Beach) Yes Yes Carolina Beach and Vicinity, NC (Area South – Kure Beach) Yes Yes Dare Co. Beaches (Bodie Island), NC Yes Yes John H. Kerr Dam and Reservoir (Major Rehab) Yes Yes West Onslow Beach (Topsail Island), NC Yes Yes Wilmington Harbor Deepening, NC Yes Yes Wrightsville Beach, NC Yes Yes Operation and Maintenance Study / Project Authorized by U.S. Congress Project which the US Congress has appropriated funding Atlantic Intracoastal Waterway, NC Yes Yes B. Everett Jordan Dam and Lake, NC Yes Yes Beaufort Harbor, NC Yes Yes Far Creek, NC Yes Yes Manteo (Shallowbag) Bay, NC Yes Yes Morehead City Harbor, NC Yes Yes Silver Lake Harbor, NC Yes Yes Stumpy Point Bay, NC Yes Yes Wilmington Harbor 42 Foot, NC Yes Yes 3 Continuing Authorities Program Study / Project "Named" by US Congress Project which the US Congress has appropriated funding Belhaven Harbor Environmental Improvements, NC (Sec 1135) Yes Yes Concord Streams Restoration, NC (Sec 206) Yes Yes Manteo, Old House Channel (Sec. 204) Yes Yes Wilson Bay Restoration, NC (Sec 206) Yes Yes B. Category 3: Water Resources Development Projects for Which Grant Applications have been Submitted Under Part 8 of Article 21 of Chapter 143 of the General Statutes Project Sponsor County Asheville Stormwater Study City of Asheville Buncombe Avery County High School Stormwater Wetland Avery County School Board Avery Bald Creek Restoration (SS) Haywood Soil and Water Haywood Banner Elk Elementary School SW Wetland & Stream Restoration Town of Banner Elk Avery Bear Creek DD #1 Water Management Wayne Co. Drainage District #1 Wayne Beaufort Regional Health Water Management Beaufort Regional Health System Beaufort Big Creek Restoration Phase 2 (PS) Surry Soil and Water Surry Big Hungry River Dam Removal Phase 2 Wildlife Resources Commission Henderson Boone Fork and Watauga River Restoration (HS) Watauga County Watauga Bowlin-Peak Creek Stream Restoration New River Soil and Water Ashe Calico Bay Drainage Pender County Pender Calypso Drainage Project Town of Calypso Duplin Carolina Beach Access Phase 3 Town of Carolina Beach New Hanover Catawba Water Management Study Catawba Wateree Water Mgmt. Group Mecklenburg Chicod Creek Snagging Pitt County Pitt Cold Water Creek Restoration Cabarrus Soil and Water Cabarrus Colington Harbor Entrance Channel Phase 7 Dare County Dare Connestee Falls Park Transylvania County Transylvania Contentnea Creek Water Management Greene County Greene County-wide NPS GIS Evaluation Madison Soil and Water Madison Coweeta Creek Restoration (CS) Macon Soil and Water Macon Cub Creek Park Bioretention Project Town of Wilkesboro Wilkes Dogwood Park Phase 2 Village of Wesley Chapel Union East Sugarloaf Island Groin Town of Morehead City Carteret Elm Grove Water Management Bertie County Bertie French Broad River Restoration (GAES) Transylvania Soil and Water Transylvania French Broad River Restoration (PS) Transylvania Soil and Water Transylvania Goshen Swamp Water Management Duplin Soil and Water Duplin Greenevers Water Management Town of Greenevers Duplin Indian Grave Creek Restoration Town of Kenansville Duplin Irish Creek Restoration (SS) Burke Soil and Water Burke Island Creek (and tributaries) Water Management Duplin County Duplin Little Fisher River Restoration Surry Soil and Water Surry Little Fork Creek Restoration State (Division of Forest Resources) Wilkes 4 Livingston Creek Water Management Columbus County Columbus Lumber River Snagging Phase 4 Lumber River COG Robeson Mars Hills Elementary Water Management Madison Soil and Water Madison Mill Branch Drainage Pender County Pender Mitchell River Restoration Surry Soil and Water Surry Mitchell River Wetland Restoration Surry Soil and Water Surry MST Park (FS and Land Acquisition) Phase 2 Town of Clayton Johnston Nags Head Beach Protection Town of Nags Head Dare Obids Creek Restoration New River Soil and Water Ashe Ocean Isle Beach Stormwater Town of Ocean Isle Beach Brunswick Pine Level Drainage Town of Pine Level Johnston Polk County Courthouse Water Management Town of Columbus Polk Riverview Acres Navigation Phase 2 Pasquotank County Pasquotank Roscoe Creek Drainage Pender County Pender Saddle Mountain Creek Restoration Surry Soil and Water Surry Shoal Creek Restoration (MS) Yancey Soil and Water Yancey Shuford Mills (Brookford) Dam removal project. Catawba Soil and Water Catawba Sills Creek Drainage Pender County Pender Skewarkee Trail Stormwater Management Town of Williamston Martin South Hominy Creek Restoration (IS) Buncombe Soil and Water Buncombe Southern H.S. Water Mgmt. Design Phase 2 Durham Soil and Water Durham Southern Shores Dredging Phase 3 Town of Southern Shores Dare Stewarts Creek Restoration Surry Soil and Water Surry Stewarts Creek Water Management Duplin County Duplin Trent River Navigation Phase 3 Jones County Jones Tuckerhole Creek Stream Restoration Town of Wilkesboro Wilkes UT Kings Creek Restoration (LS) Caldwell Soil and Water Caldwell Vance Dam Removal and Rose Ck. Stabilization Mitchell Soil and Water Mitchell Wallace Storm Drainage Phase 2 Town of Wallace Duplin Walnut Street Culvert Water Management City of Lumberton Robeson Wendell Stormwater Study - Lake Dr. Catchment Town of Wendell Wake West Montgomery High Water Management Montgomery County Board of Education Montgomery West Pine Swamp Creek Restoration New River Soil and Water Ashe Western NC Nature Center Water Management City of Asheville Buncombe White Oak Branch Drainage Pender County Pender Woodfin Greenway Trail & Stream Enhancement Town of Woodfin Buncombe Zack Circle Stormwater City of Jacksonville Onslow 5 C. Category 4: Water Resources Development Projects for Which Grant Applications have been Submitted Under Article 4 of Chapter 139 of the General Statutes None at this time D. Category 5: Water Resources Development Projects Planned as Federal Reservoir Projects but for Which no Federal Funds are Scheduled and for Which Local Governments are Seeking State Financial Assistance None at this time III. Priorities for projects planned for FY 2011-2012 A. Priority recommendations for Water Resources Development Projects approved by Congress and projects for which Congress has appropriated funds. One project deferred – Tar River and Pamlico Sound Investigation. No projects recommended for elimination in FY 2011-2012. Priority Name of Project State Funds Recommended Reason 1 Wilmington Harbor Deepening $600 Navigation Benefits 2 Wilmington Harbor Maintenance 200 Navigation Benefits 3 Morehead City Harbor Maintenance 100 Navigation Benefits 4 B. Everett Jordan Water Supply 200 Water Supply Benefits 5 Wilmington Harbor Improvements Feasibility Study 93 Navigation Benefits 6 Bogue Banks Shore Protection Study 87 Beach Protection Benefits 7 John H. Kerr Dam and Reservoir (Sec 216) 100 Environmental Benefits 8 Belhaven Harbor (Sec 1135) 17 Environmental Benefits 9 Manteo Old House Channel (Sec 204) 1250 Environmental Benefits 10 Concord Stream Restoration (Sec 206) 35 Environmental Benefits 11 Wilson Bay Restoration (Sec 206) 105 Environmental Benefits 12 Planning Assistance to Communities 50 Environmental Benefits 13 Neuse River Basin PED 300 Environmental Benefits 14 Currituck Sound Water Management Study 275 Environmental Benefits 15 Princeville Flood Control 200 Flood Protection Benefits 16 Surf City/N. Topsail Beach Protection 116 Beach Protection Benefits 17 West Onslow Beach (Topsail Island) Study $123 Beach Protection Benefits Sub-Total = $3,851 B. Priority recommendations for Water Resources Development Projects for which Local Governments have submitted grant applications under G.S. 143-215.71 *. 33 projects recommended for deferral in FY 2011-2012. No projects recommended for elimination in FY 2011-2012. (Amounts in Thousands) Priorit y Name of Project State Funds Recommende d Reason 1 Aquatic Plant Control, Statewide and Lake Gaston $300 Environmental benefits 2 Shuford Mills (Brookford) Dam Removal 98 Environmental benefits 3 Dogwood Park Phase 2 127 High local recreational benefits 4 Carolina Beach Access Phase 3 71 High local recreational benefits 5 Big Hungry River Dam Removal Phase 2 100 Environmental benefits 6 MST Park (FS & Land Acquisition) Phase 2 193 High local recreational benefits 7 Southern H.S. Water Mgmt. Design Phase 2 90 Environmental benefits 8 Wendell Stormwater Study - Lake Dr. Catchment 5 Environmental benefits 9 Cub Creek Park Bioretention Project 40 Environmental benefits 6 10 Avery County High School Stormwater Wetland 175 Environmental benefits 11 South Hominy Creek Restoration (IS) 109 Environmental benefits 12 Ocean Isle Beach Stormwater 95 Environmental benefits 13 Stewarts Creek Restoration 138 Environmental benefits 14 Connestee Falls Park 167 High local recreational benefits 15 Western NC Nature Center Water Management 87 Environmental benefits 16 West Montgomery High Water Management 78 High local recreational benefits 17 Boone Fork and Watauga River Restoration (HS) 117 Environmental benefits 18 Shoal Creek Restoration (MS) 40 Environmental benefits 19 Bowlin-Peak Creek Stream Restoration 34 Environmental benefits 20 Irish Creek Restoration (SS) 18 Environmental benefits 21 Coweeta Creek Restoration (CS) 25 Environmental benefits 22 Big Creek Restoration Phase 2 (PS) 10 Environmental benefits 23 Mitchell River Wetland Restoration 56 Environmental benefits 24 French Broad River Restoration (GAES) 28 Environmental benefits 25 Tuckerhole Creek Stream Restoration 241 Environmental benefits 26 Obids Creek Restoration 240 Environmental benefits 27 UT Kings Creek Restoration (LS) 45 Environmental benefits 28 Trent River Navigation Phase 3 31 High local recreational benefits 29 Polk County Courthouse Water Management 139 Environmental benefits 30 Mitchell River Restoration 56 Environmental benefits 31 Little Fork Creek Restoration 319 Environmental benefits 32 West Pine Swamp Creek Restoration 138 Environmental benefits 33 Bald Creek Restoration (SS) 70 Environmental benefits 34 Vance Dam Removal and Rose Creek Stabilization 75 Environmental benefits 35 Little Fisher River Restoration 112 Environmental benefits 36 French Broad River Restoration (PS) 90 Environmental benefits 37 Banner Elk Elementary School SW Wetland & Stream Restoration 229 Environmental benefits 38 Catawba Water Management Study 38 Environmental benefits 39 Lumber River Snagging Phase 4 63 State paddle trail and recreational benefits 40 Saddle Mountain Creek Restoration $22 Environmental benefits Sub-Total = $4,109 * Priority projects as of June 1, 2011, list is subject to change if any additional submittals are made prior to July 1, 2011 grant application deadline. Note that there is no federal cost-share associated with these projects. C. Water Resources Development Projects For Which Grant Applications Have Been Submitted Under G.S. 139-54 No grant applications received, no projects recommended for deferral or elimination in FY 2011-2012. D. Water Resources Development Projects Planned as Federal Reservoir Projects but for Which Local Governments are Seeking State Financial Assistance No request received, no projects recommended for deferral or elimination in FY 2011-2012. 7 IV. Project Information This section of the Water Resources Development Plan contains the information required by G.S. 143-215.73A(d) for each project listed in Section II, Project Listing. Information for each project is presented in alphabetical order by category. A. Project Information, Categories 1 and 2, Water Resources Development Projects Approved by Congress and Water Resources Development Projects for which Congress has Appropriated Funds. Project Name Page No. Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging 9 AIWW, Snows Cut, New Hanover County, Section 216 9 B. Everett Jordan Lake Water Supply Storage 10 Bald Head Island Beach Renourishment 10 Beaufort Harbor Maintenance Dredging 11 Belhaven Harbor Environmental Improvements, Section 1135 11 Bogue Banks Beach Protection 12 Brunswick County Beaches – Ocean Isle Beach 12 Brunswick County Beaches – Oak Island, Caswell and Holden Beaches 13 Cape Fear River Above Wilmington, Section 216 13 Carolina Beach, New Hanover County, Section 216 14 Carolina Beach Renourishment, New Hanover County 14 Carolina Beach South (Kure Beach) Renourishment, New Hanover County 15 Concord Stream Restoration, Cabarrus County, Section 206 15 Currituck Sound Environmental Restoration 16 Dare County Beaches 16 Far Creek Maintenance Dredging, Hyde County 17 John H. Kerr Dam and Reservoir, Section 216 17 Manteo, Old House Channel, Dare County, Section 204 18 Manteo Shallowbag Bay Maintenance Dredging, Dare County 18 Morehead City Harbor Dredging, Carteret County 19 Neuse River Basin Investigation 19 Planning Assistance to North Carolina Communities 20 Princeville Flood Control Study 20 Silver Lake Harbor, Ocracoke, Hyde County 21 Stumpy Point Bay Maintenance Dredging, Dare County 21 Surf City – North Topsail Beach Restoration, Pender County 22 Tar River and Pamlico Sound Investigation 22 West Onslow Beach – Topsail Beach, Pender County 23 Wilmington Harbor Deepening, New Hanover and Brunswick Counties 23 Wilmington Harbor 42-Ft. Project, New Hanover and Brunswick Counties 24 Wilmington Harbor Improvement Feasibility Study, NC 24 Wilmington Harbor, Section 216 25 Wilson Bay Restoration, Onslow County, Section 206 25 Wrightsville Beach Renourishment, New Hanover County 26 Propose projects in the USACE – Wilmington District 27 8 ( This Page Intentionally Left Blank ) Project Name Description Total Cost as of June 30, 2011 Federal* State Local Total $ 2 0,944,000 $ 3 ,230,650 $ 7 33,736 $ 24,908,386 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 18,148,000 $ - $ - Federal State Local FY 2012 $ 3 ,148,000 $ - $ - FY 2013 $ 3 ,000,000 $ - $ - FY 2014 $ 3 ,000,000 $ - $ - FY 2015 $ 3,000,000 $ - $ - FY 2016 $ 3,000,000 $ - $ - FY 2017 $ 3,000,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,300,000 $ 600,000 $ 600,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ - $ - $ - ATLANTIC INTRACOASTAL WATERWAY (AIWW) MAINTENANCE DREDGING ATLANTIC INTRACOASTAL WATERWAY (AIWW), SNOWS CUT (SECTION 216) The AIWW navigation channel runs 308 miles from the Virginia state line to the South Carolina state line through Currituck, Camden, Dare, Tyrrell, Hyde, Beaufort, Pamlico, Carteret, Onslow, Pender, New Hanover, and Brunswick Counties. In the past, the Wilmington District, Corps of Engineers has had sufficient funds to keep this channel dredged to its authorized depth of -12 feet, mean low water. However, several times in the last decade, the District has not had sufficient funds to perform this dredging. In order to keep the AIWW open for both commercial and recreational boat traffic, the State of North Carolina has provided funds to the Wilmington District so that they could hire a dredging contractor to do the dredging. N/A Ongoing Estimated Completion Date * Federal "Total Cost" is estimate for last 10 years Awaiting federal funding Estimated Completion Date FY 2017, if funded in FY 2013 Status of Project 9 Status of Project Construction of Snow’s Creek Cut allowed salt water from Myrtle Grove Sound to enter the Cape Fear River estuary near its midpoint. This has had far reaching effects on the physical, chemical, and biological functioning of the estuary. High salt content has manifested itself with timber die-off, which is present throughout many of the freshwater swamps above Wilmington. In addition, it has resulted in increased current and projected future costs to industries in the upper estuary due to increased monitoring and modifications of their facilities in order to cope with increasing salt loads. Reduction in the amount of introduced salts, which serve to flocculate riverine sediments in the area, could also result in substantial reduction of maintenance dredging at Military Ocean Terminal Sunny Point. The Corps has proposed a Section 216 study on the salt water intrusion problem in the Cape Fear River estuary, of which Snow’s Cut has a role. The Corps would begin a reconnaissance study in FY 2013 to determine whether it is in the Federal interest to do this study. The U.S. Congress has not approved funding for this study and the non-federal sponsor is yet to be determined. Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ 1,327,312 $ 2,841,994 $ 4,169,306 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ 1,178,000 $ 674,000 O & M $ - $ 222,000 $ 108,000 Federal State Local FY 2012 $ - $ 200,000 $ 355,000 FY 2013 $ - $ 200,000 $ 355,000 FY 2014 $ - $ 250,000 $ 18,000 FY 2015 $ - $ 250,000 $ 18,000 FY 2016 $ - $ 250,000 $ 18,000 FY 2017 $ - $ 250,000 $ 18,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 500,000 $ 250,000 $ 250,000 FY 2015 $ 500,000 $ 250,000 $ 250,000 FY 2016 $ 500,000 $ 250,000 $ 250,000 FY 2017 $ - $ - $ - On hold, awaiting action by Congress 10 Estimated Completion Date Status of Project B. EVERETT JORDAN LAKE WATER SUPPLY BALD HEAD ISLAND BEACH RENOURISMENT, BRUNSWICK COUNTY The Village of Bald Head Island has requested that the Wilmington District, U.S. Army Corps of Engineers, perform a feasibility study on a shore protection project for the portions of its beach that are experiencing severe erosion. If directed by the U.S. Congress, the Wilmington District will perform a reconnaissance study, funded entirely with federal monies, in Fiscal Year 2013. If the reconnaissance study shows that there is a federal interest in doing this project, a cost-shared feasibility study will likely begin in Fiscal Year 2014. Unknown at this time N/A Ongoing Estimated Completion Date Status of Project B. Everett Jordan Lake is a U.S. Army Corps of Engineers' multipurpose reservoir that became operational in 1983. The water supply storage in the lake was included at the request of the State of North Carolina and was done with the understanding that the actual users of the water would repay the Corps the costs of including the water supply storage and the portion of the annual operating and maintenance costs associated with that storage. The General Statute GS 143- 354(a)(11) of the State of North Carolina gives the Environmental Management Commission (EMC) the authority to allocate to local governments any water supply storage held by the State in Federal reservoirs. The estimated safe yield of the 45,800 acre-feet of water supply storage is 100 million gallons per day. As of May 2007 the EMC has allocated 63 percent of that storage as follows: Level I allocations: Towns of Cary and Apex, Chatham County, City of Durham, Town of Morrisville, and Wake County - RTP South.; and Level II allocations: Town of Holly Springs, Orange County, and Orange Water & Sewer Authority. Both the State and the local government allocation holders are paying their proportionate shares of the interest on the cost of the water supply storage, plus their share of the O&M and major rehabilitation cost. In addition, local government allocation holders using Jordon Lake water are also paying off the principle. The initial principle amount was $4,388,000; as of March 1, 2011 the current remaining balance to be paid is $1,928,878 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 1,250,000 $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 250,000 $ - $ - FY 2014 $ 250,000 $ - $ - FY 2015 $ 250,000 $ - $ - FY 2016 $ 250,000 $ - $ - FY 2017 $ 250,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 230,000 $ - $ 130,000 $ 360,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 100,000 $ 17,000 $ 17,000 O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ 17,000 $ 17,000 FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - 11 Status of Project BEAUFORT HARBOR MAINTENANCE DREDGING, CARTERET COUNTY BELHAVEN HARBOR ENVIRONMENTAL IMPROVEMENTS (BEAUFORT COUNTY) (SECTION 1135) This Corps of Engineers navigation project is located at the Town of Beaufort. The project consists of five segments: (1) the 15-foot deep Bulkhead Channel from the Town to Beaufort Inlet; (2) the 15-foot deep Gallants Channel from the Town north to the Newport River; (3) the 15-foot deep Taylor’s Creek Channel from the Town east to the North River and Back Sound; (4) the 12-foot deep Town Creek Channel and Basin north of Beaufort; and (5) the 14-foot Morgan Creek Channel and Basin. Carteret County, the non-Federal sponsor. N/A Next maintenance scheduled for FY2012 Estimated Completion Date The proposed project will replace and upgrade the existing breakwaters that protect the harbor and waterfront of Belhaven, NC. The existing breakwaters consist of northern and southern structures, each about 1900 feet long, at the entrance to Pantego Creek, separated by a central 500 foot navigation opening. The existing structures have many openings that allow water to pass through with little abatement. In the Spring of 2009, the Wilmington District, Corps of Engineers, received $3,250,000 in Disaster Supplemental funds to replace the existing structure with a new timber structure. This work will be done in FY 2011. The Corps is also studying the addition of submerged reefs in the lee (harbor side) of both breakwaters. These reefs would improve the estuarine habitat and also increase sheltering of the harbor from waves, and if funded, could be constructed in FY 2013 The Corps plans to complete the replacement of the timber breakwater in 2011 and, if funded, the reef construction in 2013. Estimated Completion Date FY 2013 Status of Project Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 2,513,000 $ 1,249,250 $ 1,031,000 $ 4,793,250 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 710,000 $ 546,000 $ 545,000 Construction $ 31,150,000 $ 8,202,000 $ 8,202,000 O & M Federal State Local FY 2012 $ 174,000 $ 87,000 $ 87,000 FY 2013 $ 186,000 $ 284,000 $ 283,000 FY 2014 $ 350,000 $ 175,000 $ 175,000 FY 2015 $ 250,000 $ 50,000 $ 50,000 FY 2016 $ 900,000 $ 75,000 $ 75,000 FY 2017 $ 30,000,000 $ 8,077,000 $ 8,077,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 14,190,570 $ 5,361,538 $ 2,279,538 $ 21,831,646 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 7,650,000 $ 1,886,000 $ 1,886,000 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 300,000 $ - $ - FY 2014 $ 3,500,000 $ 943,000 $ 943,000 FY 2015 $ - $ - $ - FY 2016 $ 350,000 $ - $ - FY 2017 $ 3,500,000 $ 943,000 $ 943,000 The Corps feasibility study should be complete in FY 2013. Preliminary engineering and design should begin in FY 2013 Estimated Completion Date Status of Project 12 Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project BOGUE BANKS BEACH PROTECTION, CARTERET COUNTY BRUNSWICK COUNTY BEACHES (OCEAN ISLE), NC This Corps of Engineers project is located in the Town of Ocean Isle Beach and provides for hurricane-wave protection and beach erosion control along the oceanfront. A levee consisting of a continuous vegetated dune and high beach berm stabilized by periodic nourishment has been constructed. The dune crown width is 25 feet at elevation 20 feet above mean sea level fronted by a storm berm having a width of 50 feet at elevation 15 feet above mean sea level for a distance of 28,000 feet. This project was approved as a new construction start in fiscal year 2000’s budget and was constructed in 2001. Beach was renourished in FY 2010. Bogue Banks is the barrier island in Carteret County located between Beaufort Inlet to the east and Bogue Inlet to the west. The communities of Pine Knoll Shores, Salter Path, Indian Beach, and Emerald Isle have experienced considerable erosion to the dune system and severe damage to upland structures due to recent hurricanes. Carteret County is requesting 50 percent cost-sharing of the non-Federal cost of the feasibility study for the Bogue Banks Shore Protection project that would be done by the Corps of Engineers. The Corps plans to complete the feasibility study in FY13, do preliminary engineering and design work in FY 13 and 14, and then do the nourishment of the beaches in FY 15, 16 and 17. FY 2051 FY 2018 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 6,933,000 $ 301,000 $ 7,234,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 37,996,000 $ 9,430,000 $ 9,430,000 O & M Federal State Local FY 2012 $ 346,000 $ - $ - FY 2013 $ 350,000 $ - $ - FY 2014 $ 500,000 $ - $ - FY 2015 $ 900,000 $ - $ - FY 2016 $ 900,000 $ - $ - FY 2017 $ 35,000,000 $ 9,430,000 $ 9,430,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ 300,000 $ 150,000 $ 150,000 GRR is expected to be completed in 2012; plans and specs will be done in 2014, and initial beach nourishment in FY 2017 Estimated Completion Date Status of Project 13 Awaiting federal funding Estimated Completion Date Status of Project BRUNSWICK COUNTY BEACHES – OAK ISLAND, CASWELL AND HOLDEN BEACHES CAPE FEAR RIVER ABOVE WILMINGTON, SECTION 216 The Wilmington District, Corps of Engineers, proposes to investigate the operation of the Federal navigation channels and locks in the Cape Fear River above Wilmington. The Corps would begin a reconnaissance study in FY 2013 to determine whether it is in the Federal interest to do this study. No state or local matching funds are required. The study will determine if the Corps should continue to operate the lock and dam in the future. The U.S. Congress has not approved funding for this study and the non-federal sponsor is yet to be determined. This Corps of Engineer project will protect these beaches through the construction of continuous storm berms and dunes along their ocean shorelines. The Wilmington District is investigating what the most effective dimensions of these berms and dunes should be through the preparation of a General Re-evaluation Report (GRR). They hope to complete the GRR in 2012. If that is the case, then initial construction would occur in Fiscal Year 2017, and re-nourishments would occur at three- to four-year intervals for the life of this project. The cost-sharing would initially be 65 percent Federal, 35 percent non-Federal, but then switch to 50–50 for all re-nourishments. The costs shown for construction and re-nourishments are general estimates. FY 2017, if funded in FY 2013 FY 2067 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,100,000 $ 500,000 $ 500,000 Construction O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 500,000 $ 250,000 $ 250,000 FY 2015 $ 500,000 $ 250,000 $ 250,000 FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 30,130,142 $ 11,518,462 $ 4,705,462 $ 46,354,065 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 3,134,000 $ 789,900 $ 789,900 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 200,000 $ - $ - FY 2014 $ 2,934,000 $ 789,900 $ 789,900 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Awaiting federal funding Estimated Completion Date Status of Project 14 Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project CAROLINA BEACH, NEW HANOVER COUNTY, SECTION 216 CAROLINA BEACH RENOURISHMENT, NEW HANOVER COUNTY This Corps of Engineers project is located in the Town of Carolina Beach, about 15 miles south of Wilmington. The project provides for restoring the dune with a base generally bordering at or near the building line. The dune dimensions are a crown width of 25 feet at an elevation of 15 feet above mean low water together with an integral beach berm with a crown width of 50 feet at elevation 12 feet. Beach fill extends about 14,000 feet from the northern to the southern limits of Carolina Beach. Along the northern 2,050 feet, the project includes a rock revetment at elevation 12 feet fronted by 130-foot wide berm at elevation 8 feet. Federal participation in the cost of beach renourishment will run for a period not to exceed 50 years from year of initial placement (1965-2015). The Carolina Beach portion of this project is located in New Hanover County, NC, about 15 miles southeast of Wilmington, NC, on the peninsula which separates the lower Cape Fear River from the Atlantic Ocean. It includes a dune with a crown width of 25 feet at an elevation of 13.5 feet, with an integral beach berm with a crown width of 50 feet at elevation 10.5 feet and beach fill extending about 14,000 feet from the northern to southern limits of Carolina Beach. Local interests desire evaluation of the coastal storm damage reduction project to determine the feasibility of extending the authorization to continue to nourish this portion of the project past FY 2015. FY 2015 FY 2015, if funded in FY 2013 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 19,496,140 $ 7,280,461 $ 3,217,461 $ 29,994,062 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 2,450,000 $ 606,000 $ 606,000 O & M Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 200,000 $ - $ - FY 2014 $ 2,250,000 $ 606,000 $ 606,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 322,000 $ 140,000 $ 140,000 $ 602,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 3,014,000 $ 59,000 $ 59,000 O & M $ - $ - $ - Federal State Local FY 2012 $ 125,000 $ 35,000 $ 35,000 FY 2013 $ 2,785,000 $ 24,000 $ 24,000 FY 2014 $ 104,000 $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Next scheduled renourishment in FY 2013. No funding provided in FY 2012 President's budget, schedule subject to change. Estimated Completion Date Status of Project 15 Construction began in FY 2011 Estimated Completion Date Status of Project CAROLINA BEACH SOUTH, NEW HANOVER COUNTY CONCORD STREAM RESTORATION (SECTION 206), CABARRUS COUNTY Restoration and rehabilitation are proposed for four stream segments in Concord: Three Mile Branch (approximately 8,000 feet), Afton Run (5,800 feet), Stricker Branch (approximately 5,500 feet), and Academy Center Branch (4,000 feet). The watersheds of the four streams are experiencing rapid residential and commercial development that has led to a variety of negative impacts on the subject streams, including slope failures, bank erosion, high in-stream sediment loadings, and loss of vegetated riparian buffers. The project would consist of stream channel reconstruction where feasible, restoration of riparian buffers, construction of natural marsh catchments, and purchase of existing wildlife corridors. In addition, aquatic habitat will be restored through the installation of in-stream habitat improvement structures. The City of Concord is the non-federal sponsor. This Corps of Engineers hurricane protection project is being constructed south of Carolina Beach in front of developments known as Wilmington Beach and Kure Beach. It provides for construction of a dune with a base generally bordering at or near the building line with a crown width of 25 feet at an elevation of 13.5 feet above mean low water and a beach berm 50 feet wide at elevation 9.0 feet above mean low water, extending 18,000 feet from the southern limits of Carolina Beach. Federal participation in the cost of beach nourishment will not exceed 50 years from year of initial placement, which was April of 1998. The Town of Kure Beach is the non-Federal sponsor of this project. FY 2014 FY 2047 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,366,000 $ 1,151,000 $ - $ 2,517,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 283,000 $ 499,000 $ - Construction $ 20,750,000 $ 11,034,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 400,000 $ 400,000 $ - FY 2013 $ 183,000 $ 183,000 $ - FY 2014 $ 450,000 $ 150,000 $ - FY 2015 $ 10,000,000 $ 5,400,000 $ - FY 2016 $ 10,000,000 $ 5,400,000 $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of March 31, 2010 Federal State Local Total $ 4,169,000 $ 242,000 $ 81,000 $ 4,492,000 Estimated costs from 07/01/2010 through 06/30/2016 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ - $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Feasibility Study is on-going Estimated Completion Date Status of Project 16 Preliminary engineering and design is on hold indefinitely Estimated Completion Date Status of Project CURRITUCK SOUND ENVIRONMENTAL RESTORATION DARE COUNTY BEACHES The Corps of Engineers has completed a detailed feasibility study of a 20-mile long section of beach from the northern limits of Dare County to just south of Nags Head. The area, which is largely developed, has experienced erosion and damages as a result of recent storms and hurricanes. The study has located sand sources that could be used for beach nourishment. The Corps recommends that the initial nourishment be done on approximately 13.5 miles of beach in three phases over a three-year period. The design cost-sharing agreement between Dare County and the Corps of Engineers was signed in July 2001. The project cooperation agreement was executed in September 2004. The lack of Federal funding has delayed the start of the project. Project is currently on hold. Currituck Sound is a 153 square mile brackish water estuary separated from the Atlantic Ocean by the Outer Banks. A recent increase in salinity levels has caused a severe decline in many freshwater fisheries (largemouth bass, black crappie, and bluegill). Also, there has been a significant loss of submerged aquatic vegetation. The Corps, in partnership with the State of North Carolina has begun an investigation to determine the specific causes of the decline in species mentioned above and the necessary actions to restore the Sound. If the study finds a feasible solution, implementation would begin in FY 14. N/A FY 2016 Project Name Description Total Cost as of June 30, 2011 Federal State* Local* Total $ - $ 220,694 $ 48,923 $ 269,617 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 925,000 $ 155,000 $ 155,000 Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 925,000 $ 155,000 $ 155,000 FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,969,186 $ 1,423,186 $ 3,392,372 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 279,000 $ 279,000 Construction $ 1,125,000 $ 375,000 O & M Federal State Local FY 2012 $ 365,000 $ 307,500 $ - FY 2013 $ 300,000 $ 100,000 $ - FY 2014 $ 300,000 $ 100,000 $ - FY 2015 $ 300,000 $ 100,000 $ - FY 2016 $ 139,000 $ 46,500 $ - FY 2017 $ - $ - $ - FAR CREEK MAINTENANCE DREDGING, HYDE COUNTY JOHN H. KERR DAM AND RESERVOIR, NC & VC SECTION 216 STUDY John H. Kerr Reservoir is operated by the Corps of Engineers for flood control, hydropower, recreation, and water releases to enhance striped bass spawning in the Roanoke River. The storage and release of water at Kerr Dam affects agriculture, forestry, wildlife, water quality, and industrial water use in the entire lower Roanoke Basin. The State of North Carolina, the Commonwealth of Virginia, and the Corps of Engineers are sponsoring a study of the operation of Kerr Lake to see if the economic and environmental benefits from the lake can be increased. At the end of the study it is anticipated that both structural and non-structural measures will be taken to improve the operation of John H. Kerr Dam. Preliminary engineering and design of these measures would begin in FY 2013. This project involves the maintenance dredging of the navigation channel in Far Creek, which runs from the village of Engelhard to Pamlico Sound. The channel is used by commercial fishing boats that dock in the basin at Engelhard. The channel is 12 feet deep and 100 feet wide. The non-Federal cost is required to prepare the dredged material disposal site. Hyde County is the non-federal sponsor of the project. The next maintenance dredging of the channel is expected to be required in FY 2013. FY 2016 N/A Dike construction in support channel dredging scheduled for FY 2013 Estimated Completion Date Status of Project 17 Feasibility scheduled for completion in FY 2012, if funding available Estimated Completion Date *State and Local expenditures since 2004 Status of Project Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 250,000 $ - $ - $ 250,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 360,000 $ - $ - Construction $ 1,940,000 $ 1,250,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 2,300,000 $ 1,250,000 $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State* Local Total $ - $ 14,312,043 $ - $ 14,312,043 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 46,300,000 $ 7,000,000 $ - Federal State Local FY 2012 $ 3,300,000 $ - $ - FY 2013 $ 8,000,000 $ 2,000,000 $ - FY 2014 $ 8,300,000 $ 2,000,000 $ - FY 2015 $ 8,600,000 $ 2,000,000 $ - FY 2016 $ 8,900,000 $ - $ - FY 2017 $ 9,200,000 $ 1,000,000 $ - FY 2013, if funded 2012 Awaiting federal funding Estimated Completion Date Status of Project 18 Ongoing Estimated Completion Date *State expenditures since 2001 Status of Project MANTEO, OLD HOUSE CHANNEL, SECTION 204, DARE COUNTY MANTEO (SHALLOWBAG BAY) MAINTENANCE DREDGING, DARE COUNTY As part of the maintenance dredging of the navigation channel going from Oregon Inlet to Wanchese Harbor, the Corps of Engineers must provide environmentally sound spoil disposal sites. As the non-Federal sponsor of this channel, the state is required to pay for preparation of the spoil disposal sites, which involves the raising of dikes around a spoil disposal island (Island H). The Corps pays for 100% of the dredging costs. In addition to the channel from Oregon Inlet to Wanchese Harbor, there are two other channels—the Manteo to Wanchese and the North—that are a part of this project. Because the Corps views these projects as primarily recreational, it has not maintained them. Because of this policy, the state has paid to keep these channels open. The proposed project would use sandy dredged material from maintenance dredging of Old House Channel to build submerged sand mounds to be topped with cultch for oyster reefs. Sand would be placed in submerged enclosures in a depth of water where optimum oyster growing conditions are found. The submerged mounds will be located near the authorized navigation channel where submerged aquatic vegetation (SAV) or other significant resources exist. Creation of the submerged sand mounds would provide an environmentally sound disposal area for dredged material. N/A Project Name Description Total Cost as of June 30, 2011 Federal State* Local Total $ - $ 2,213,698 $ - $ 2,213,698 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 35,900,000 $ 300,000 $ - Federal State Local FY 2012 $ 5,900,000 $ 100,000 $ - FY 2013 $ 10,500,000 $ - $ - FY 2014 $ 7,000,000 $ 100,000 $ - FY 2015 $ 2,500,000 $ - $ - FY 2016 $ 7,500,000 $ 100,000 $ - FY 2017 $ 2,500,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,579,000 $ 1,457,000 $ - $ 3,036,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ 87,000 $ - Construction $ 25,279,000 $ 8,656,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 400,000 $ 250,000 $ - FY 2013 $ 500,000 $ 167,000 $ - FY 2014 $ 900,000 $ 300,000 $ - FY 2015 $ 9,963,000 $ 3,321,000 $ - FY 2016 $ 3,916,000 $ 1,305,000 $ - FY 2017 $ 10,000,000 $ 3,400,000 $ - $ - *State expenditures since 2001 Status of Project MOREHEAD CITY HARBOR DREDGING, CARTERET COUNTY NEUSE RIVER BASIN INVESTIGATION Water quality and flooding problems in the Neuse River Basin have impacted the lives and livelihood of many citizens of the Neuse River Basin. This study will focus on ways to improve water quality as well as how best to improve aquatic habitats. It focuses on three areas: (1) stream and wetland restoration; (2) removal of obsolete dams and other obstructions; and (3) restoration of oyster habitat and oysters in the Neuse River estuary. Projects recommended by this study may be done as continuing authority projects by the Corps of Engineers, if funding is available, or by the State of North Carolina, if federal funding is not available. The deepening of Morehead City Harbor to 45 feet was completed in 1994. Maintenance dredging of this Harbor has been done in two ways: (1) sand from the outer ocean bar channels has been placed in either an ocean disposal site or a near shore site and (2) mostly sandy material from the inner channel and harbor area has been pumped to the Brandt Island disposal area. As the non-Federal sponsor of this project, the state is required to pay for preparation of the spoil disposal sites, which involves the raising of dikes and spillway repairs. The Corps pays for 100% of the dredging costs. FY 2017 N/A Ongoing Estimated Completion Date Status of Project 19 Feasibility scheduled for completion in FY 2012, if funding available Estimated Completion Date Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,275,820 $ 331,455 $ 306,455 $ 1,913,730 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 600,000 $ 300,000 $ 300,000 Construction O & M Federal State Local FY 2012 $ 100,000 $ 50,000 $ 50,000 FY 2013 $ 100,000 $ 50,000 $ 50,000 FY 2014 $ 100,000 $ 50,000 $ 50,000 FY 2015 $ 100,000 $ 50,000 $ 50,000 FY 2016 $ 100,000 $ 50,000 $ 50,000 FY 2017 $ 100,000 $ 50,000 $ 50,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 1,597,000 $ 1,400,000 $ - $ 2,997,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 303,000 $ 303,000 $ - Construction $ 13,488,000 $ 7,262,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 203,000 $ 203,000 $ - FY 2014 $ 425,000 $ 275,000 $ - FY 2015 $ 163,000 $ 87,000 $ - FY 2016 $ 13,000,000 $ 7,000,000 $ - FY 2017 $ - $ - $ - PLANNING ASSISTANCE TO NORTH CAROLINA COMMUNITIES Section 22 of the Water Resources Development Act of 1974 allows the Corps to assist states and local communities with preparation of comprehensive plans for the development, use, and conservation of water and related land resources. The non-Federal sponsor (state and/or local government) must provide 50% of the cost. For studies sponsored by units of local government, the state can provide up to 50% of the non- Federal cost. One project currently underway: Black Mountain Dam Study. One project proposal currently under consideration by the U.S. Corps of Engineers: Greenville Utilities Commission/Neuse Water and Sewer Authority Interconnection Study. N/A Status of Project FY 2016 20 Ongoing Estimated Completion Date PRINCEVILLE FLOOD CONTROL STUDY This Corps of Engineering study was funded by a special appropriation from Congress and requires that the State match these funds dollar for dollar. The purpose of the study is to determine what additional flood control measures to protect the Town of Princeville are feasible. The Corps has completed some preliminary work that indicates that the more expensive flood control measures, such as the construction of a flood bypass channel, the construction of upstream flood control dams, and the flood-proofing of existing structures are not feasible. The feasibility study is scheduled for completion in FY 2012, if funding is available. Status of Project Feasibility is scheduled for completion by end of 2012. If funds are appropriated, work on plans & specs will begin in FY 2013. Estimated Completion Date Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ - $ - $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 5,250,000 $ 250,000 $ 250,000 Federal State Local FY 2012 $ 250,000 $ - $ - FY 2013 $ 1,000,000 $ 250,000 $ 250,000 FY 2014 $ 1,000,000 $ - $ - FY 2015 $ 1,000,000 $ - $ - FY 2016 $ 1,000,000 $ - $ - FY 2017 $ 1,000,000 $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - $ - $ - $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 1,500,000 $ 250,000 $ 250,000 Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ 250,000 $ 250,000 FY 2014 $ 1,500,000 $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - SILVER LAKE HARBOR MAINTENANCE DREDGING, OCRACOKE, HYDE COUNTY This project includes 12-foot deep basin within Silver Lake Harbor at Ocracoke, a 60-foot wide by 12-foot deep entrance channel from the harbor to the Teaches Hole Channel, the 150-foot wide by 12-foot deep Teaches Hole Channel to Ocracoke Inlet, and 150-foot wide by 12-foot deep Big Foot Slough Channel from the Teaches Hole Channel to Pamlico Sound. Hyde County, the local sponsor, is responsible for the costs of the sand-bag dikes used in dredging the Big Foot Slough Channel. These dikes were replaced in FY 2006 and should last until at least FY 2013 N/A Status of Project 21 Sandbag improvements scheduled for FY 2013 Estimated Completion Date STUMPY POINT BAY MAINTENANCE DREDGING, DARE COUNTY This project involves the maintenance dredging of the 3.8 mile navigation channel in Stumpy Point Bay. The channel is 10-feet deep and 75-feet wide. Material will be placed on an upland disposal site on land owned by the US Fish and Wildlife Service. Dare County is the non-federal sponsor of this project. Status of Project Dike raising in FY 2013, if funding ia available Estimated Completion Date N/A Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 2,341,000 $ 1,080,500 $ 1,080,500 $ 4,502,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 65,000 Construction $ 43,135,000 $ 8,999,667 $ 9,049,667 O & M Federal State Local FY 2012 $ 700,000 $ 116,667 $ 166,667 FY 2013 $ 300,000 $ 50,000 $ 50,000 FY 2014 $ 200,000 $ 33,000 $ 33,000 FY 2015 $ - $ - $ - FY 2016 $ 21,000,000 $ 3,200,000 $ 3,200,000 FY 2017 $ 21,000,000 $ 5,600,000 $ 5,600,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 137,000 $ - $ - $ 137,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ - $ - $ - FY 2014 $ - $ - $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - SURF CITY – NORTH TOPSAIL BEACH PROTECTION, PENDER COUNTY This potential hurricane protection project began in FY 2001 with a reconnaissance study funded entirely by the Corps of Engineers. That study determined that there was a Federal interest in a beach nourishment project to protect citizens of Surf City and the southern 4-mile section of North Topsail Beach from storm damages. In February 2002, the Corps entered into an agreement with the Towns of Surf City and North Topsail Beach to conduct a feasibility study funded jointly with the two towns. The feasibility study is scheduled for completion in late FY 2011 FY 2065 Status of Project 22 Fesability scheduled for completion in FY 2011. Development of plans & specs to be initiated in FY 2012, if funding available Estimated Completion Date TAR RIVER AND PAMLICO SOUND INVESTIGATION The Wilmington District, Corps of Engineers, is planning to investigate flooding, drainage, and water supply problems in the Tar – Pamlico River Basin. The Corps would then propose alternative measures to solve these problems. The State of North Carolina would be the non-Federal sponsor of this study. Because of other higher priority studies and limited manpower, the State has declined sponsorship of this study at this time. Status of Project Deferred indefinitely by the State Estimated Completion Date N/A Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 3,821,398 $ 660,366 $ 660,366 $ 5,142,130 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility Construction $ 27,597,000 $ 4,599,667 $ 4,599,667 O & M Federal State Local FY 2012 $ 742,000 $ 123,667 $ 123,667 FY 2013 $ - $ - $ - FY 2014 $ 26,855,000 $ 4,476,000 $ 4,476,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 242,208,000 $ 73,995,550 $ 1,345,000 $ 317,548,550 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 49,900,000 $ 16,597,000 $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 1,900,000 $ 600,000 $ - FY 2013 $ 20,000,000 $ 6,667,000 $ - FY 2014 $ 28,000,000 $ 9,330,000 $ - FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ - $ - $ - WEST ONSLOW BEACH (TOPSAIL BEACH), PENDER COUNTY This authorized Corps of Engineers shore protection project for approximately 3 miles of the oceanfront at Topsail Beach on the southern end of Topsail Island was placed in the inactive category in July 1994 due to lack of local support. The town requested the Corps reevaluate the project area plus an additional 2.5 miles. The Corps of Engineers began a general reevaluation in October 2001. Cheif's report signed in September 2009. The initial plans and specs initiated in FY 2010. FY 2065 Status of Project 23 Project authorization in Water Resources Development Act in FY 2011 is next milestone Estimated Completion Date WILMINGTON HARBOR DEEPENING, NEW HANOVER and BRUNSWICK COUNTIES This project includes deepening of Wilmington Harbor, the navigation channel in the Cape Fear River from Wilmington Harbor to the Atlantic Ocean, and the Northeast Cape Fear River navigation channel. It also includes the construction of a 200-foot widening of the Cape Fear River navigation channel for a distance of 6 miles (called a passing lane) and the construction of wideners at the major turns and bends of that Cape Fear channel. The deepening will allow Wilmington Harbor to accommodate fully loaded container ships and other bulk cargo ships and keep shipping costs competitive with those at Norfolk, Charleston, and Savannah. The passing lane and wideners will allow larger ships to navigate the Cape Fear River channel in less time and greater safety. The U.S. Congress funded a new start on this combined navigation project in 1997. This project also includes the construction of a long-term disposal site for materials dredged in the vicinity of the State Port. Status of Project Dike raises at Eagle Island and installation of fish passage at Lock and Dam #1 will occur in FY 2012 Estimated Completion Date FY 2014, if funding is available. Project Name Description Total Cost as of March 31, 2010 Federal State* Local Total $ - $ 6,219,872 $ - $ 6,219,872 Estimated costs from 07/01/2010 through 06/30/2016 Federal State Local Feasibility $ - $ - $ - Construction $ - $ - $ - O & M $ 84,945,000 $ 1,200,000 $ - Federal State Local FY 2012 $ 12,445,000 $ 200,000 $ - FY 2013 $ 13,500,000 $ 200,000 $ - FY 2014 $ 14,000,000 $ 200,000 $ - FY 2015 $ 14,500,000 $ 200,000 $ - FY 2016 $ 15,000,000 $ 200,000 $ - FY 2017 $ 15,500,000 $ 200,000 $ - Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 100,000 $ - $ - $ 100,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 5,293,000 $ 4,793,000 $ - Constuction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ 93,000 $ 93,000 $ - FY 2013 $ 400,000 $ 400,000 $ - FY 2014 $ 1,600,000 $ 1,600,000 $ - FY 2015 $ 1,500,000 $ 1,500,000 $ - FY 2016 $ 1,500,000 $ 1,000,000 $ - FY 2017 $ 200,000 $ 200,000 $ - WILMINGTON HARBOR MAINTENANCE DREDGING, 42 FT. PROJECT, NEW HANOVER AND BRUNSWICK COUNTIES Maintenance dredging is required almost every year to keep open the channels from the Atlantic Ocean up the Cape Fear and Northeast Cape Fear rivers to Wilmington, Fayetteville, and other terminal points. The Federal government pays for the cost of dredging the sediments, while the state of North Carolina, the non- Federal sponsor, pays for the cost of dredged material disposal areas. Without this maintenance work, the exporting and importing of goods and commodities through the State Ports Authority terminal and numerous private terminals could not occur. The beach quality sand that is dredged from the navigation channel from the Atlantic Ocean to Wilmington is placed on the following beaches: Carolina Beach, Bald Head Island, Caswell Beach, and Oak Island. N/A Status of Project 24 Ongoing Estimated Completion Date *State expenditures since 2001 WILMINGTON HARBOR IMPROVEMENTS FEASIBILITY STUDY, NC This is a proposed cost-shared U.S. Army Corps of Engineers feasibility study which would investigate issues related to traffic delays and safety concerns caused by the existing Wilmington Harbor channel alignment. Areas to be investigated include the entrance channel, navigation channel adjacent to Bald Head Island and the Battery Island turn, and the safe and efficient turning of containerships in the existing Anchorage Basin, The study would seek to identify options for improving access to the State Ports Authority terminal and other private terminals in the Wilmington Harbor complex and improve safety for ships visiting the harbor. The safe and efficient operation of the Wilmington Harbor complex is vital to the economy of the local area and the entire State. Status of Project Recon study completed Estimated Completion Date FY 2016 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ - Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ 1,600,000 $ 750,000 $ 750,000 Construction $ - $ - $ - O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 100,000 $ - $ - FY 2014 $ 400,000 $ 200,000 $ 200,000 FY 2015 $ 400,000 $ 200,000 $ 200,000 FY 2016 $ 400,000 $ 200,000 $ 200,000 FY 2017 $ 300,000 $ 150,000 $ 150,000 Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 961,000 $ 240,000 $ 240,000 $ 1,441,000 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 2,909,000 $ 777,000 $ 777,000 O & M $ - $ - $ - Federal State Local FY 2012 $ 2,491,000 $ 105,000 $ 105,000 FY 2013 $ 270,000 $ 633,000 $ 633,000 FY 2014 $ 50,000 $ 14,000 $ 14,000 FY 2015 $ 50,000 $ 14,000 $ 14,000 FY 2016 $ 48,000 $ 11,000 $ 11,000 FY 2017 $ - $ - $ - 25 WILSON BAY RESTORATION (SECTION 206) , ONSLOW COUNTY Wilson Bay is a 106-acre shallow estuarine embayment of the New River within the City of Jacksonville. The Wilson Bay aquatic ecosystem was degraded by many years of wastewater from a sewage treatment plant and by urban non-point source runoff. This restoration project’s goals are to improve water quality, restore the benthic community and the use of the Bay as a nursery area, and restore the use of the Bay for recreation and economic purposes. The City of Jacksonville has already taken several major actions to rehabilitate the Bay including the decommissioning of the wastewater treatment plant, installing three water column aeration units, planting oysters in the bay, and planting wetlands along the shoreline. The Corps has designed a project to help the City’s project become self-sustaining. It will purchase and operate three additional aerators, restore wetlands and creeks within the Wilson Bay urban watershed, plant additional oysters and submerged aquatic vegetation, and install bio-swales and rain gardens. The City of Jacksonville is the non-federal sponsor of the project. Status of Project Project in design stage and scheduled for award in FY 2011 Estimated Completion Date FY 2017 WILMINGTON HARBOR INPROVEMENTS, SECTION 216 This proposed study will review the Wilmington Harbor navigation project from the Horseshoe Shoal area through the inner ocean bar channel, located on the southeastern coast of North Carolina in Brunswick and New Hanover Counties. The existing project provides for a channel 44 feet deep through the ocean bar and entrance channel changing to 42 feet deep extending to the upper portion of the anchorage basin at the state of North Carolina ports facility at Wilmington, NC. This study will review the completed project and determine if modifications are advisable due to significantly changed physical, environmental, and/or economic conditions. Alternatives to be investigated could include leaving the channel in their current status or modifying channel depths and/or alignment through partial or total removal. Status of Project Awaiting federal funding Estimated Completion Date Unknown at this time Project Name Description Total Cost as of June 30, 2011 Federal State Local Total $ 11,914,000 $ 4,287,308 $ 1,721,308 $ 17,922,616 Estimated costs from 07/01/2011 through 06/30/2017 Federal State Local Feasibility $ - $ - $ - Construction $ 4,200,000 $ 942,000 $ 942,000 O & M $ - $ - $ - Federal State Local FY 2012 $ - $ - $ - FY 2013 $ 350,000 $ - $ - FY 2014 $ 3,500,000 $ 942,000 $ 942,000 FY 2015 $ - $ - $ - FY 2016 $ - $ - $ - FY 2017 $ 350,000 $ - $ - Next renourishment scheduled for FY 20 14 Estimated Completion Date FY 2036 26 WRIGHTSVILLE BEACH RENOURISHMENT, NEW HANOVER COUNTY This Corps of Engineers project is located at Wrightsville Beach, a barrier island about 5 miles east of Wilmington. The project provides both beach erosion and hurricane protection. It consists of a frontal dune at elevation 15-feet above mean low water and a beach berm at elevation 12-feet. The project was built to protect against hurricanes equal to that of October 15, 1954 (Hurricane Hazel). The Water Resources Development Act of 1986 provides for Federal participation in the renourishment of the project over its 50-year lifetime, until 2036. Renourishment normally occurs every four years. Status of Project Federal State Local 204 Brandt Island, NC Beneficial use of dredged material $ 3,140,000 $ 1,610,000 TBD 204 Manteo Old House Channel, Dare County * Oyster reef creation from dredge spoils $ 2,728,000 $ 1,173,000 TBD 206 Gum Thicket Creek Restoration, Oriental, Pamlico County Marsh creation, Shoreline stabilization $ 1,485,000 $ 915,000 TBD 206 NC Oyster Habitat Restoration Oyster habitat restoration $ 1,305,000 $ 695,000 TBD 206 Gooch's Mill Dam Removal, Granville Co, NC Dam removal to restore fish migration $ 573,000 $ 278,000 TBD 206 Monkey Island Restoration, NC Habitat creation, shoreline stabilization $ 885,000 $ 455,000 TBD 206 NC Fish Passage and Dam Removals, NC Dam removals to restore fish migration $ 2,575,000 $ 1,425,000 TBD 206 Northern Currituck Sound SAV and Marsh Restoration, NC Habitat restoration $ 1,825,000 $ 975,000 TBD 206 Southern Currituck Sound SAV and Marsh Restoration, NC Habitat restoration $ 1,825,000 $ 975,000 TBD 1135 Belhaven Harbor Environmental Improvements, NC * Habitat creation $ 2,300,000 $ 837,000 $ 407,000 Federal State Local 9 AIWW - Snows Cut, New Hanover County Salt water intrusion to Cape Fear River estuary $ 1,600,000 $ 750,000 $ 750,000 13 Cape Fear Above Wilmington, NC Deauthorization of L&D 1,2 & 3 $ 1,600,000 $ 750,000 $ 750,000 14 Carolina Beach, NC Reuthorization of beach renourishment project $ 1,100,000 $ 500,000 $ 500,000 25 Wilmington Harbor, NC Channel performance evaluation $ 1,600,000 $ 750,000 $ 750,000 Proposed projects in USACE-Wilmington District A. Continuing Authorities Programs Projects that are funded through the Continuing Authorities Program include: Section 204 (Beneficial use of dredged material), Section 206 (Restoration of aquatic ecosystems), and Section 1135 (Modifications to Corps projects for the Improvement of the Environment). These three sections have been authorized by the U.S. Congress and are annually funded by section. Projects that are "named" by the U.S. Congress receive priority for funding within that section. The Corps allocates funding to named projects first before unnamed projects. B. General Investigations Project Name Type Estimated Cost Estimated Cost Section Section 216 grants the Corps the authority to reevaluate existing Corps projects. The Corps can conduct reconnaissance and feasibility studies under Sec. 216, but authorization from the U.S. Congress is required for any construction activities. 27 Page Project Name Study Subject * Federal funds have been allocated for these two projects. Project have not been initiated, details can be found on pages 11 (Belhaven) and 18 (Manteo) 28 ( This Page Intentionally Left Blank ) 29 B. Project Information, Category 3, Water Resources Development Projects for Which Grant Applications Have Been Submitted Under Part 8 of Article 21 of Chapter 143 of the General Statutes Project application status is as of June 1, 2011 and subject to change if any additional submittals are made prior to July 1, 2011 grant application deadline. Project Name Page No. Aquatic Weed Control – Lake Gaston 31 Aquatic Weed Control – Statewide 31 Aquatic Weed Control Equipment Storage Facility 31 Asheville Stormwater Study 32 Avery County High School Stormwater Wetland 32 Bald Creek Restoration (SS) 32 Banner Elk Elementary School SW Wetland & Stream Restoration 32 Bear Creek DD #1 Water Management 33 Beaufort Regional Health Water Management 33 Big Creek Restoration Phase 2 (PS) 33 Big Hungry River Dam Removal Phase 2 33 Boone Fork and Watauga River Restoration (HS) 34 Bowlin-Peak Creek Stream Restoration 34 Calico Bay Drainage 34 Calypso Drainage Project 34 Carolina Beach Access Phase 3 35 Catawba Water Management Study 35 Chicod Creek Snagging 35 Cold Water Creek Restoration 35 Colington Harbor Entrance Channel Phase 7 36 Connestee Falls Park 36 Contentnea Creek Water Management 36 County-wide NPS GIS Evaluation 36 Coweeta Creek Restoration (CS) 37 Cub Creek Park Bioretention Project 37 Dogwood Park Phase 2 37 East Sugarloaf Island Groin 37 Elm Grove Water Management 38 French Broad River Restoration (GAES) 38 French Broad River Restoration (PS) 38 Goshen Swamp Water Management 38 Greenevers Water Management 39 Indian Grave Creek Restoration 39 Irish Creek Restoration (SS) 39 Island Creek (and tributaries) Water Management 39 Little Fisher River Restoration 40 Little Fork Creek Restoration 40 Livingston Creek Water Management 40 Lumber River Snagging Phase 4 40 Mars Hills Elementary Water Management 41 Mill Branch Drainage 41 30 Mitchell River Restoration 41 Mitchell River Wetland Restoration 41 MST Park (FS and Land Acquisition) Phase 2 42 Nags Head Beach Protection 42 Obids Creek Restoration 42 Ocean Isle Beach Stormwater 42 Pine Level Drainage 43 Polk County Courthouse Water Management 43 Riverview Acres Navigation Phase 2 43 Roscoe Creek Drainage 43 Saddle Mountain Creek Restoration 44 Shoal Creek Restoration (MS) 44 Shuford Mills (Brookford) Dam removal project. 44 Sills Creek Drainage 44 Skewarkee Trail Stormwater Management 45 South Hominy Creek Restoration (IS) 45 Southern H.S. Water Mgmt. Design Phase 2 45 Southern Shores Dredging Phase 3 45 Stewarts Creek Restoration 46 Stewarts Creek Water Management 46 Trent River Navigation Phase 3 46 Tuckerhole Creek Stream Restoration 46 UT Kings Creek Restoration (LS) 47 Vance Dam Removal and Rose Ck. Stabilization 47 Wallace Storm Drainage Phase 2 47 Walnut Street Culvert Water Management 47 Wendell Stormwater Study - Lake Dr. Catchment 48 West Montgomery High Water Management 48 West Pine Swamp Creek Restoration 48 Western NC Nature Center Water Management 48 White Oak Branch Drainage 49 Woodfin Greenway Trail & Stream Enhancement 49 Zack Circle Stormwater 49 Project Name Description State Local Total State Total $ 100,000 $ 100,000 $ 200,000 $ 2,134,375 $ 4,053,525 Project Name Description State Local Total State Total $ 200,000 $ 200,000 $ 400,000 $ 1,534,559 $ 2,805,695 Project Name Description State Local Total State Total $ 267,000 $ 267,000 $ - 31 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Project involves the construction of a pre-engineered building (120’ x 32’) for housing equipment associated with the N.C. Division of Water Resources Aquatic Weed Control Program. The facility would be located in Raleigh, on land leased from North Carolina State University. The N.C. Division of Water Resources provides technical assistance to local governments and public utilities in the management of noxious aquatic weed infestations. This assistance involves the use of an assortment of specialized equipment which is required to conduct the field work. The types of equipment include: Truck, boats (3 airboats, 2 jonboats), canoes, small gas-powered engines, sprayers, spreaders, power cutters, hand tools, etc. This equipment is currently stored at a temporary location pending the construction of a proper facility. The new facility would allow for centralized long-term storage and a base for field operations. The facility would provide a safe place to service and repair equipment and protect sensitive and AQUATIC WEED CONTROL EQUIPMENT STORAGE FACILITY Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 specialized equipment from the weather. The facility would also provide a secure room for the herbicides and related chemicals used by the program. N.C. State University has agreed to prepare a site and provide utilities in exchange for shared space in the new facility. The NCSU has an aquatic weed research program that is part of the Crop Science division. They are interested in consolidating their operations into one location. The needs of the two programs (DWR and NCSU) align and the partnership will provide mutual benefits In 1985, a survey of Lake Gaston found 15 acres infested with the aquatic weed Hydrilla. By the fall of 1996, the infestation had grown to over 3,250 acres. The total area of Lake Gaston that can potentially be impacted is about 5,000 acres, or all of the lake that is less than 10 feet deep. Hydrilla interferes with fishing, boating, swimming, and water skiing. The Division of Water Resources has assisted the Lake Gaston Weed Control Council in chemical and biological treatments since 1994. In 2010, approximately 802 acres of weed infested waters were treated using herbicides, and an additional 367 acres were targeted with biological agents AQUATIC WEED CONTROL – LAKE GASTON $ 1,919,150 Status of Project Local Est. Completion Date G.S. 143-215.71 AQUATIC WEED CONTROL - STATEWIDE The N.C. Div. of Water Resources provides technical and financial assistance to local governments in the evaluation and treatment of aquatic weed infestations. State financial assistance (50% cost-sharing) for local weed control projects is still available. During the 2010 treatment season, DWR worked with local government and utility sponsors in the treatment of approximately 1405 acres of weed infested waters using herbicides, and an additional 730 acres were targeted with biological agents (Treatment numbers include Lake Gaston). In 2011 a similar number of projects and scope is expected. The estimated total cost to provide this service is $200,000 State Funding Source Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local G.S. 143-215.71 N/A Ongoing Ongoing Awaiting State funding Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ 1,271,136 State Funding Source Project Name Project Sponsor County Description State Local Total State Total $ 24,000 $ 24,000 $ 48,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 175,000 $ 175,000 $ 350,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 69,794 $ 69,794 $ 139,588 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 228,636 $ 228,636 $ 457,271 $ - $ - 32 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 1,260 feet of eroding streambank along Bald Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This study will develop stormwater best management practice (BMPs) guidelines for the urbanized Asheville area. $ - State Funding Source G.S. 143-215.71 Deferred Asheville Stormwater Study City of Asheville Buncombe This project will treat stormwater runoff diverted from a 15-acre urban catchment before it enters Kentucky Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Avery Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will construct a one-acre stormwater wetland, a one-acre riparian wetland and restore 600 feet of eroding streambank. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Avery County High School Stormwater Wetland Avery County School Board Avery Bald Creek Restoration (SS) Haywood Soil and Water Haywood Banner Elk Elementary School SW Wetland & Stream Restoration Town of Banner Elk Project Name Project Sponsor County Description State Local Total State Total $ 24,975 $ 24,975 $ 49,950 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 197,498 $ 197,498 $ 394,996 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 10,000 $ 10,000 $ 20,000 $ 110,000 $ 165,000 Project Name Project Sponsor County Description State Local Total State Total $ 99,500 $ 99,500 $ 199,000 $ - $ - 33 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This feasibility study will provide engineering design and permitting for restoring a 4,000-foot reach of streambank along Big Creek. Status of Project Local $ 55,000 Deferred This project will make repairs at four dam water control structures. $ - State Funding Source G.S. 143-215.71 Deferred Bear Creek DD #1 Water Management Wayne County Drainage District # Wayne This project will redesign and enlarge an existing stormwater retention pond to increase capacity and improve treatment of stormwater runoff. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Henderson Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will assist the NC Wildlife Resources Commission in the removal of the Big Hungry Dam which impedes movement of aquatic organisms. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Beaufort Regional Health Water Management Beaufort Regional Health System Beaufort Big Creek Restoration Phase 2 (PS) Surry Soil and Water Surry Big Hungry River Dam Removal Phase 2 Wildlife Resources Commission Project Name Project Sponsor County Description State Local Total State Total $ 116,567 $ 116,567 $ 233,133 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 33,750 $ 33,750 $ 67,500 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 284,858 $ 284,858 $ 569,715 $ - $ - 34 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This proposed project will develop a basin wide Water Supply Master Plan for the Catawba Basin. The project will better equip the Catawba Wateree Water Management Group to comprehensively address all water related issues in the CW Basin, in support of its overall mission. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will stabilize 1,500 feet of eroding streambank along Boone Fork and the Watauga River. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Boone Fork and Watauga River Restoration (HS) Watauga County Watauga This project will stabilize 1,180 feet of eroding streambank along Peak Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will replace drainage infrastructure in three watersheds located within the Town of Calypso. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Bowlin-Peak Creek Stream Restoration New River Soil and Water Ashe Calico Bay Drainage Pender County Pender Calypso Drainage Project Town of Calypso Project Name Project Sponsor County Description State Local Total State Total $ 70,616 $ 70,616 $ 141,232 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 37,500 $ 37,500 $ 75,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 14,546 $ 14,546 $ 29,091 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,870 $ 56,870 $ 113,741 $ - $ - 35 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 5 mile reach of upper Chicod Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project involves the purchase of a 0.287 acre parcel which will become part of the Ocean-to-Sound Access Park and future home of the NC Aquarium Pier. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Carolina Beach Access Phase 3 Town of Carolina Beach New Hanover This project will update the Catawba Wateree water Supply Study that was originally conducted in 2006 as part of Duke Energy's hydro relicensing effort. The update is required every 10 years in the settlement Agreement that was negotiated between S.C. and N.C. in order to resolve the Supreme Court lawsuit that was initiated by S.C. over the equitable use of the Catawba Wateree water. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Cabarrus Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 1,300 feet of eroding streambank along Cold Water Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Catawba Water Management Study Catawba Wateree Water Managem Mecklenburg Chicod Creek Snagging Pitt County Pitt Cold Water Creek Restoration Cabarrus Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 15,675 $ 15,675 $ 31,350 $ 94,933 $ 118,666 Project Name Project Sponsor County Description State Local Total State Total $ 166,500 $ 166,500 $ 333,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 69,260 $ 69,260 $ 138,520 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 23,035 $ 23,035 $ 46,070 $ - $ - 36 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 20 mile reach of Contentnea Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This is Phase 7 of an ongoing dredging project to maintain the navigation channel at the entrance to Colington Harbor. $ 23,733 State Funding Source G.S. 143-215.71 Deferred Colington Harbor Entrance Channel Phase 7 Dare County Dare This project will upgrade recreation amenities at Connestee Falls Park. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Madison Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will perform a preliminary GIS evaluation of pollutant sources in Madison County with follow-up field observations. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Connestee Falls Park Transylvania County Transylvania Contentnea Creek Water Management Greene County Greene County-wide NPS GIS Evaluation Madison Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 25,345 $ 25,345 $ 50,690 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 40,000 $ 40,000 $ 80,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 127,433 $ 127,433 $ 254,866 $ 86,060 $ 172,120 Project Name Project Sponsor County Description State Local Total State Total $ 206,500 $ 206,500 $ 413,000 $ - $ - 37 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will construct water-based recreation amenities at Dogwood Park. Status of Project Local $ 86,060 Water Resources Development Grant Application under consideration for funding This project will stabilize 250 feet of eroding streambank along Coweeta Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Coweeta Creek Restoration (CS) Macon Soil and Water Macon This project will treat stormwater runoff diverted from a 22-acre urban catchment before it enters Cub Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Carteret Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will construct a groin on the east end of Sugarloaf Island to abate sand migration into the Morehead City Bulkhead Navigation Channel. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Cub Creek Park Bioretention Project Town of Wilkesboro Wilkes Dogwood Park Phase 2 Village of Wesley Chapel Union East Sugarloaf Island Groin Town of Morehead City Project Name Project Sponsor County Description State Local Total State Total $ 24,663 $ 24,663 $ 49,325 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 28,395 $ 28,395 $ 56,790 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 89,728 $ 89,728 $ 179,456 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 198,283 $ 198,283 $ 396,567 $ - $ - 38 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 1,027 feet of eroding streambank along the French Broad River. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will dip out and redesign 4,200 feet of open drainage channel and replace culverts at two private road crossings. $ - State Funding Source G.S. 143-215.71 Deferred Elm Grove Water Management Bertie County Bertie This project will stabilize 325 feet of eroding streambank along the French Broad River. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 25.3 mile reach of Goshen Swamp. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A French Broad River Restoration (GAES) Transylvania Soil and Water Transylvania French Broad River Restoration (PS) Transylvania Soil and Water Transylvania Goshen Swamp Water Management Duplin Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 21,655 $ 21,655 $ 43,310 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 124,250 $ 124,250 $ 248,501 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 17,504 $ 17,504 $ 35,007 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 127,741 $ 127,741 $ 255,483 $ - $ - 39 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 374 feet of eroding streambank along Irish Creek. Status of Project Local $ - Deferred This project will perform 29,144 feet of roadside ditch maintenance within the Town of Greenevers. $ - State Funding Source G.S. 143-215.71 Deferred Greenevers Water Management Town of Greenevers Duplin This project will stabilize 1,500 feet of eroding streambank along Indian Grave Creek using gabion baskets. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 16.3 mile reach of Island Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Indian Grave Creek Restoration Town of Kenansville Duplin Irish Creek Restoration (SS) Burke Soil and Water Burke Island Creek (and tributaries) Water Management Duplin County Project Name Project Sponsor County Description State Local Total State Total $ 112,444 $ 112,444 $ 224,888 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 318,591 $ 318,591 $ 637,181 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 90,874 $ 90,874 $ 181,748 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 62,500 $ 62,500 $ 125,000 $ 293,200 $ 366,500 40 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove flow blockages from a 8.1 mile reach of Livingston Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will stabilize 2,400 feet of eroding streambank along the Little Fisher River. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Little Fisher River Restoration Surry Soil and Water Surry This project will stabilize 5,000 feet of eroding streambank along the Little Fork Creek within the Rendezvous Mountain Educational State Forest. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Robeson Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ 73,300 Status of Project Est. Completion Date This project will remove small boat navigation hazards from a 64 mile reach of the Lumber River. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Little Fork Creek Restoration State (Division of Forest Resourc Wilkes Livingston Creek Water Management Columbus County Columbus Lumber River Snagging Phase 4 Lumber River COG Project Name Project Sponsor County Description State Local Total State Total $ 21,990 $ 21,990 $ 43,981 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 37,481 $ 37,481 $ 74,963 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,222 $ 56,222 $ 112,444 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 56,222 $ 56,222 $ 112,444 $ - $ - 41 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 4,400 feet of eroding streambank along the Mitchell River. Status of Project Local $ - Deferred This project will install and evaluate the effectiveness of a mycofiltration water quality improvement technique at two locations. $ - State Funding Source G.S. 143-215.71 Deferred Mars Hills Elementary (mycofiltration) Water Management (Prior funding) Madison Soil and Water Madison This project will remove flow blockages from a 2.2 mile reach of Mill Branch. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Surry Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 3,550 feet of eroding streambank along the Mitchell River and an unnamed tributary. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Mill Branch Drainage Pender County Pender Mitchell River Restoration Surry Soil and Water Surry Mitchell River Wetland Restoration Surry Soil and Water Project Name Project Sponsor County Description State Local Total State Total $ 192,500 $ 192,500 $ 385,000 $ 96,000 $ 192,000 Project Name Project Sponsor County Description State Local Total State Total $ 10,964,167 $ 22,260,581 $ 33,224,748 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 239,880 $ 239,880 $ 479,760 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 95,424 $ 95,424 $ 190,847 $ - $ - 42 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 2,500 feet of eroding streambank along Obids Creek and an unnamed tributary. Status of Project Local $ - Deferred This project involves the purchase of 11 properties having a total area of 37 acres for the Mountains to Sea Trail corridor along the Neuse River. $ 96,000 State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding MST Park (FS and Land Acquisition) Phase 2 Town of Clayton Johnston This project will renourish 10 miles of beach by hydraulic dredge using 4.6 million cubic yards of beach-quality sand located in offshore ocean borrow areas. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Brunswick Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will collect and treat stormwater runoff along 4,520 linear feet of roadway within the community. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Nags Head Beach Protection Town of Nags Head Dare Obids Creek Restoration New River Soil and Water Ashe Ocean Isle Beach Stormwater Town of Ocean Isle Beach Project Name Project Sponsor County Description State Local Total State Total $ 133,433 $ 133,433 $ 266,867 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 138,681 $ 138,681 $ 277,361 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 228,450 $ 228,450 $ 456,900 $ 39,400 $ 49,250 Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - 43 Deferred Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This is Phase 2 of a dredging project to improve navigation within the Riverview Acres subdivision located on the Pasquotank River. Status of Project Local $ 9,850 Water Resources Development Grant Application under consideration for funding This project will upgrade the stormwater drainage infrastructure at three locations within the Town of Pine Level. $ - State Funding Source G.S. 143-215.71 Deferred Pine Level Drainage Town of Pine Level Johnston This project will utilize three innovative approaches to control stormwater runoff and improve runoff water quality within the Courthouse Square area in the Town of Columbus. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Pender Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 2.2 mile reach of Roscoe Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Polk County Courthouse Water Management Town of Columbus Polk Riverview Acres Navigation Phase 2 Pasquotank County Pasquotank Roscoe Creek Drainage Pender County Project Name Project Sponsor County Description State Local Total State Total $ 22,489 $ 22,489 $ 44,978 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 39,730 $ 39,730 $ 79,460 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 97,500 $ 97,500 $ 195,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 112,444 $ 112,444 $ 224,888 $ - $ - 44 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will complete the design, permitting requirements and removal of the Shuford Mills Dam located on the Henry Fork River in Catawba County near the community of Brookford. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will replace the culvert underneath Reynolds Road that is a fish barrier in Saddle Mountain Creek; which is designated as an Outstanding Resource Water by the NC Wildlife Resources Commission. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Saddle Mountain Creek Restoration Surry Soil and Water Surry This project will stabilize 875 feet of eroding streambank along Shoal Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Pender Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will remove flow blockages from a 2.5 mile reach of Sills Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A Shoal Creek Restoration (MS) Yancey Soil and Water Yancey Shuford Mills (Brookford) Dam removal project. Catawba Soil and Water Catawba Sills Creek Drainage Pender County Project Name Project Sponsor County Description State Local Total State Total $ 17,347 $ 17,347 $ 34,693 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 109,328 $ 109,328 $ 218,657 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 90,000 $ 90,000 $ 180,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 250,000 $ 250,000 $ 500,000 $ 848,000 $ 1,292,894 45 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will design a retrofit for stormwater conveyance from roofs, parking lots and other impervious areas on the school grounds to bioretention ponds, stormwater treatment wetlands, underground cisterns and rain gardens. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This project will install BMPs to reduce erosion along a section of the Town's stormwater management system. $ - State Funding Source G.S. 143-215.71 Deferred Skewarkee Trail Stormwater Management Town of Williamston Martin This project will stabilize 1,265 feet of eroding streambank along South Hominy Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Dare Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ 444,894 Status of Project Est. Completion Date This project will maintenance dredge 7 miles of canal within Southern Shores and the channel connecting the canal system to Currituck Sound. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Deferred N/A South Hominy Creek Restoration (IS) Buncombe Soil and Water Buncombe Southern High School Water Management Design Phase 2 Durham Soil and Water Durham Southern Shores Dredging Phase 3 Town of Southern Shores Project Name Project Sponsor County Description State Local Total State Total $ 137,500 $ 137,500 $ 275,000 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 68,181 $ 68,181 $ 136,361 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 31,250 $ 31,250 $ 62,500 $ 173,840 $ 217,300 Project Name Project Sponsor County Description State Local Total State Total $ 240,630 $ 240,630 $ 481,259 $ - $ - 46 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will remove small boat navigation hazards from an 8 mile reach of the Trent River. Status of Project Local $ 43,460 Deferred This project will stabilize feet of eroding streambank along Stewarts Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Stewarts Creek Restoration Surry Soil and Water Surry This project will remove flow blockages from an 8.7 mile reach of Stewarts Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Wilkes Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will stabilize 1,500 feet of eroding streambank along Tuckerhole Creek. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A Stewarts Creek Water Management Duplin County Duplin Trent River Navigation Phase 3 Jones County Jones Tuckerhole Creek Stream Restoration Town of Wilkesboro Project Name Project Sponsor County Description State Local Total State Total $ 44,978 $ 44,978 $ 89,955 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 148,754 $ 148,754 $ 297,508 $ 145,504 $ 217,074 Project Name Project Sponsor County Description State Local Total State Total $ 62,462 $ 62,462 $ 124,924 $ - $ - Vance Dam Removal and Rose Creek Stabilization Mitchell Soil and Water Mitchell Wallace Storm Drainage Phase 2 Town of Wallace Duplin Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Robeson 47 Deferred N/A Walnut Street Culvert Water Management Status of Project Est. Completion Date This project will replace a box culvert underneath North Walnut Street and relocated utilities required to accommodate the replacement. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Deferred City of Lumberton N/A Local $ - UT Kings Creek Restoration (LS) Caldwell Soil and Water Caldwell This project will remove an earthen dam located on Rose Creek and restore 900 feet of stream channel. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local $ 71,570 Water Resources Development Grant Application under consideration for funding This project will stabilize 600 feet of eroding streambank along an unnamed tributary to Kings Creek. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding State Funding Source G.S. 143-215.71 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date This project will upgrade drainage infrastructure along four streets within the Town of Wallace. Status of Project Local Project Name Project Sponsor County Description State Local Total State Total $ 5,375 $ 5,375 $ 10,750 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 78,025 $ 78,025 $ 156,051 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 137,931 $ 137,931 $ 275,862 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 86,807 $ 86,807 $ 173,613 $ - $ - 48 Water Resources Development Grant Application under consideration for funding Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date N/A This project will stabilize 900 feet of eroding streambank along West Pine Swamp Creek. Status of Project Local $ - Water Resources Development Grant Application under consideration for funding This feasibility study will analyze the hydraulic capacities and identify deficiencies of the existing stormwater collection system serving the Lake Drive area of Wendell. $ - State Funding Source G.S. 143-215.71 Water Resources Development Grant Application under consideration for funding Wendell Stormwater Study - Lake Drive Catchment Town of Wendell Wake This project will install a drainage system for athletic fields at West Montgomery High School. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local Buncombe Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local $ - State Funding Source G.S. 143-215.71 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local G.S. 143-215.71 $ - Status of Project Est. Completion Date This project will utilize four innovative approaches to control stormwater runoff and improve runoff water quality at the Western NC Nature Center. Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 State Funding Source Water Resources Development Grant Application under consideration for funding N/A West Montgomery High Water Management Montgomery County Board of Ed Montgomery West Pine Swamp Creek Restoration New River Soil and Water Ashe Western NC Nature Center Water Management City of Asheville Project Name Project Sponsor County Description State Local Total State Total $ 74,963 $ 74,963 $ 149,925 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 360,170 $ 360,170 $ 720,340 $ - $ - Project Name Project Sponsor County Description State Local Total State Total $ 80,500 $ 80,500 $ 161,000 $ - $ - Woodfin Greenway Trail and Stream Enhancement Town of Woodfin Buncombe Zack Circle Stormwater City of Jacksonville Onslow Status of Project Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Local 49 Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Deferred N/A $ - White Oak Branch Drainage Pender County Pender This project will construct a 5,000-foot section of greenway along Beaver Dam Creek. Est. Completion Date N/A Estimated Cost in FY 2012 (if funded) Cost to June 30, 2011 Status of Project Local $ - Deferred This project will remove flow blockages from a 3.5 mile reach of White Oak Branch. $ - State Funding Source G.S. 143-215.71 Deferred State Funding Source G.S. 143-215.71 Est. Completion Date N/A State Funding Source G.S. 143-215.71 Est. Completion Date This project will upgrade stormwater drainage infrastructure at a site located on Zack Circle in the City of Jacksonville. Status of Project Local 50 ( This Page Intentionally Left Blank ) 51 C. Project Information, Category 4, Water Resources Development Projects for which grant applications have been submitted under Article 4 of Chapter 139 of the General Statutes. None at this time D. Project Information, Category 5, Water Resources Development Projects planned as federal reservoir projects but for which no federal funds are scheduled and for which Local Governments are seeking financial assistance. None at this time 52 APPENDIX Part 8A. Water Resources Development Plan. § 143-215.73A. Water Resources Development Plan. (a) Plan prepared. – Before 1 July in each calendar year, the Department of Environment and Natural Resources shall prepare a statewide plan for water resources development projects for a period of six years into the future. The plan shall be known as the Water Resources Development Plan. If the plan differs from the Water Resources Development Plan adopted for the preceding calendar year, the Department shall indicate the changes and the reasons for such changes. The Department shall submit the plan to the Director of the Budget for review. (b) Projects listed. – The plan shall list the following water resources development projects based on their status as of 1 May of the year in which the plan is prepared: (1) Projects approved by the Congress of the United States. (2) Projects for which the Congress of the United States has appropriated funds. (3) Projects for which grant applications have been submitted under Part 8 of Article 21 of Chapter 143 of the General Statutes. (4) Projects for which grant applications have been submitted under Article 4 of Chapter 139 of the General Statutes. (5) Projects planned as federal reservoir projects but for which no federal funds are scheduled and for which local governments are seeking State financial assistance. (c) Project priorities and funding recommendations. – The Department shall assign a priority to each project within each of the five categories listed under subsection (b) of this section either by giving the project a number, with "1" assigned to the highest priority, or by recommending no funding. The Department shall state its reasons for recommending the funding, deferral, or elimination of a project. The Department shall determine the priority of a project based on the following criteria: local interest in the project, the cost of the project to the State, the benefit of the project to the State, and the environmental impact of the project. (d) Project information. – For each project listed under subsection (b) of this section, the Water Resources Development Plan shall: (1) Provide a brief description. (2) If federal, list the estimated cost of each of the following phases that have not been completed as of 1 July, (i) feasibility study, (ii) construction, (iii) operation and maintenance, and the amount of State funds required to match the federal funds needed. (3) If State or local, list the estimated cost to complete the project and amount of State funds required under G.S. 143- 215.71 or G.S. 139-54. (4) Indicate the total cost to date and the State share of that cost. (5) Indicate the status. (6) Indicate the estimated completion date. (e) Distribution of the plan. – The Director of the Budget shall provide copies of the plan to the members of the Advisory Budget Commission when the Advisory Budget Commission meets to deliberate on the biennial budget or on the revised budget for the second year of the biennium. The Director of the Budget shall also provide copies of the plan to the General Assembly along with the recommended biennial budget and the recommended revised budget for the second year of the biennium. (f) Budget recommendations. – The Director of the Budget shall determine which projects, if any, will be included in the recommended biennial budget and in the recommended revised budget for the second year of the biennium. The budget document transmitted to the General Assembly shall identify the projects or types of projects recommended for funding. (1991, c. 181, s. 1; 1997-443, s. 11A.119(a).) |
OCLC number | 27408969 |